Installation
5.4 Mounting
WOGeneric TEAAC / 2008
Siemens AG Operating Instructions 1.03 1RQ671...-Z
23
5.4
Mounting
Requirements
Preconditions for smooth, vibration-free operation:
● Stable foundation design as per DIN 4024
● Precision alignment of the motor
● Correct balancing of parts to be fitted to the shaft end.
● ISO 10816-3-compliant vibration velocity
Proceed as follows
● Use machine fixing bolts with the necessary strength class to ISO 898-1 (e.g. 10.9) for
reliable mounting and safe transmission of forces resulting from torque.
● When selecting the bolts and the design of the foundation, take into account the
maximum forces occurring in the case of a fault such as short circuit or system transfers
in phase opposition. The values for the foundation forces can be found in the configuring
documentation or are available on request from the manufacturer.
NOTICE
System-inherent frequencies
If the foundation has not been constructed correctly, frequencies that are inherent to the
foundation can occur after the machine set has been installed (system-inherent
frequencies). This can damage the machine set.
DIN 4024 must be taken into account when constructing the machine foundation.
[ID 15.04x]
See also
Aligning (Page 22)
5.5
Installation of the Coupling
Balance quality
The rotors are balanced dynamically. For shaft extensions with featherkeys, the balancing
type is specified using the following coding on the face of the drive end of the shaft:
● "H" means balancing with a half feather key
● "F" means balancing with a whole feather key.
Summary of Contents for H-compact PLUS
Page 2: ...24 06 2009 15 03 ...
Page 10: ......
Page 18: ......
Page 22: ......
Page 40: ......
Page 60: ......
Page 77: ......
Page 80: ......
Page 81: ......
Page 83: ...Generic TEAAC 000010 001 en US Generic TEAAC 00001001EN05 ...