BA 2030
Operating Instructions, 11/2017, A5E37880173A/RS-AE
51
Commissioning
5
5.1
General information for commissioning
WARNING
Unintentional starting of the drive unit
Secure the drive unit to prevent it from being started up unintentionally.
Attach a warning notice to the start switch.
WARNING
Risk of slipping on oil
Remove any oil spillage immediately with an oil-binding agent in compliance with
environmental requirements.
Checking the pressure breather valve
Check that the breather valve is activated.
If the breather valve has a transport fixture, it must be removed before commissioning.
Figure 5-1
Pressure breather valve with securing clip
Remove the transport fixture by pulling the securing clip
①
in the direction of the arrow.
5.2
Checking the oil level prior to commissioning
Check the oil level before commissioning. Correct the oil quantity when required. Please
observe Checking and changing lubricants (Page 67).
Siemens AG recommends a complete oil change after a storage time longer than 24 months:
●
For gearboxes with long-term preservation.
●
For gearboxes supplied completely filled with oil.
Please observe Checking and changing lubricants (Page 67).
Summary of Contents for BA 2030 SERIES
Page 1: ......
Page 2: ......
Page 62: ...Operation BA 2030 60 Operating Instructions 11 2017 A5E37880173A RS AE ...
Page 66: ...Faults causes and remedies BA 2030 64 Operating Instructions 11 2017 A5E37880173A RS AE ...
Page 90: ...Disposal BA 2030 88 Operating Instructions 11 2017 A5E37880173A RS AE ...
Page 164: ...Your suggestions BA 2030 162 Operating Instructions 11 2017 A5E37880173A RS AE ...
Page 165: ......
Page 166: ......