2.2 Unloading and installation
2.2.1 Transport units
The transport units consist of up to three double panels
which are assembled including the busbars and the
associated withdrawable units.
In transport units consisting of one double panel the
busbar and branch busbar are packed separately in the
busbar compartment and fixed on the partition plate to the
cable termination compartment.
2.2.2 Packing
As specified in the order:
a) Each transport units is screwed to a sturdy wooden pallet
and covered by plastic sheeting as a protection against
rain and dust.
b) For oversea shipment, each transport unit is packed
seaworthy in a crate.. i.e. enclosed in a plastic sheeting
which is sealed air-tight and includes bags containing a
dessicant. The HV fuses and accessories are transported
in separate packing.
2.2.3 Unloading
Lifting equipment required:
• A mobile crane for unloading the transport units.
• Lifting tackle.
• A lifting truck or a fork lift with a fork length of approx
1.5 m for handing the switchgear inside the building.
• Hydraulic jacks or winches and roller pads.
• The handing/transport gear must meet the site
requirements with regard to its construction and load
bearing capacity. Make reference to the weights (for
raising and transporting) given on the transport units or
in the covering documents.
Proceed as follows:
• Unload the transport units in their packing.
• Take care not to damage the plastic sheeting.
Unloading by mobile crane:
• Suspend the lifting tackle from the crane and position it
over the transport unit.
• Attach the ropes to the tackle and position them so that
they cannot exert pressure on the switchpanel sides.
• Sling the ropes round the ends of the wooden pallet.
• Carefully lift the unit and check whether it has been
correctly balanced. If necessary, lower the unit and
rebalance.
Unloading by means of a fork lift:
• Observe uniform distribution of weight
– Move the transport units as close as possible to the
switchgear building and put them down.
– Dismantle and remove the crates (if provided).
– Move the transport units into the building.
– The plastic sheeting should only be removed in the building
shortly before the units are assembled and temporarily
to check them for signs of transport damage.
2.1
ጚԢ߾ፕ
2.1.1
एإ
–
ਸ࠲ࡋᅜҾጎሞᇨڦೝӱฉईߒীंౡཱིںӱฉLjं
ౡཱིںӱᆌାᆶएإࡆڢᅜՍਸ࠲ࡋҾጎሞฉ௬ă
ںӱڦਸ֣๖ᇀׂຫກ
006
ࡽă
–
एإยऺᅜतࠓߵူଚՔጚႜڦǖ
DIN 43 661
ĐᆩᇀҾጎሞࢽాۉഘยԢएإࡆڢđत
DIN 18 202
Đࠓ߾ײࠅֶđ
ă
–
ܔੇںኒڦएإยऺკ࿚ฉ࡛ဇோጱਸ࠲ᆶ၌ࠅິă
–
߳ਸ࠲ࡋኮक़Ҿጎೝ௬ڦࡀۨဃֶLjᅜतۙኝৰኟဃֶڦ
ݛ݆LjᆌӀ
7
ඓۨă
2.1.2
ਸ࠲
֖ለׂຫກ
006
ࡽ๖٫
ሞҾጎ้փሎႹሞࡋాओפཱིࢅࠒăਸ࠲ాᆌᆶۉ
ᇸLjࠃဌפഗأඁࣨפă
ںӱᆌೝኝᅜՍᇀټࡐईૌຼยแڦሏڇᇮᅎۯă
2.1 Preparatory work
2.1.1 Foundation
– Panels may be installed on prefabricated floors or
reinforced concrete floors. Concrete floors should be
provided with foundation rails on which the panels are
to rest.
The floor cutouts are shown in Catalog 006.
– The foundation design and construction is according to
the following standards.
DIN 43 661 "Foundation rails for electrical equipment
installed indoors" and DIN 18 202 "Tolerances in
structural engineering".
– For foundations of a seismic design consult Siemens
Switchgear Ltd., Shanghai.
– Level differences between the mounting surfaces of the
double panels should be determined and compensated
for by reference to a dimension drawing(Fig.7).
2.1.2 Installation room
For dimensions see Catalog 006
A power source must be available. No work likely to
produce dust or dirt must be carried out during the
installation work.
The floor should be flat to enable transport units to be
moved on rollers or similar devices.
2.2
ႂऋࢅҾጎ
2.2.1
ሏڇᇮ
ሏڇᇮాܠඹభෙਸ࠲ࡋLjഄాևᆶజಇतכăሞ
ኻᆶᅃਸ࠲ࡋڦሏڇᇮLjజಇतݴኧజ၍ಇݴਸԈ
ጎሞజ၍ాժࠦۨሞۉમথڦ߰ӱฉă
2.2.2
Ԉጎ
ሞ۩ऋዐᅙ׃ǖ
a
Džᅃሏڇᇮࠦሞᅃॕࠦڦڹӱฉժቸฉ໒ଙԋఈLj
ᅜݞᇐतࣨפă
b)
ܔ࡛ྔሏLjᅃሏڇᇮᆩᇀሏڦӱၒԈጎLjၒా
࣏ᆶހڦ໒ଙԋఈLjժጎᆶ߅ሳवLjߛუභഗतॲ
ᆩଷྔڦԈጎሏă
2.2.3
ႂऋ
ႴഐዘยԢǖ
•
ႂူሏڇᇮᆩڦഛכഐዘऐă
•
༵ืᆩڦࣂכă
•
ᆩഛכۗईᆩ֭ณ
1.5
ڦׁכሞॺዾాӭሏਸ
࠲ࡋă
•
ᆩᅂუഥুۥईਝᄙऐᅜतࡐڹፗጎႂ
/
ሏă
! ጎዃՂႷሞࠓሰݛ௬ࢅీ૰ฉᇑ၄ׇཉॲ၎ޙ
օየසူǖ
•
ॽሏڇᇮڦԈጎႂူLjਸၒă
ၭ႐ကॽ໒ଙԋఈ࣋ă
ᆩഐዘऐႂऋǖ
•
ॽഐዘऐڦۗࠍሞሏڇᇮ࿋ዃڦฉݛă
•
ॽุဣሞۗࠍฉLj๑்փᇀܔਸ࠲ࡋాևแेუ૰ă
•
ॽุᅎఢڹಎՉᇹৎLj࣍ජڹಎ຺ঙă
•
ൟൟۗഐሏڇᇮLjॠֱޏتᇀኟඓೝ࢚ă
ᆩׁכႂऋǖ
•
࠵ִዘଉڦݴքሌႠă
–
ॽሏڇᇮీᅎ੍ৎҾጎਸ࠲ࡋڦॺዾLjժॽ
ݣူă
–
ָأࢅᅎඁӱၒDŽ्ස༵ࠃڦࣆDž
ă
–
ॽሏڇᇮᅎॺዾă
–
ኻᆶሞҾጎኮമLj֍أඁ໒ଙԋఈLjࢫLjႜ܌ሡڦ
ॠֱLjੂഄޏᅺሏܸ࣋ă
13
12
Ҿ
ጎ
Installation