7PG21 Solkor Rf Commissioning
©2012 Siemens Protection Devices Limited
Chapter 6 Page 21 of 21
Fig 12. Test Circuit – Inverter
4.3.3 Putting into Service
Restore all connections to their correct terminals. Insert D.C. supply links and fuses and intertrip links.
Operate the intertrip send initiating contact at each end. Check that the remote end relay operates and that the
correct alarms and indications are given.