Instructions for fitting connectors, attachments and devices
2.5 Power supply
Passive network components
System Manual, 02/2013, C79000-G8976-C282-01
69
2.5
Power supply
2.5.1
Fitting the energy cable 5 x 1.5 with a power plug PRO
Introduction
The next section explains the individual steps assembling an energy cable with a power plug
PRO.
Note the information in the assembly instructions of the plug.
Connector pinout
An IE M12 plug PRO / IE FC M12 plug PRO with the pinning as shown in the following table
must be connected to both ends of the IE FC cable.
Table 2- 1
Pinning at both ends of a straight-through cable
Pin number
Pinning as a network component Color
Pin 1
RX+
Yellow
Pin 2
TX+
White
Pin 3
RX-
Orange
Pin 4
TX-
Blue
The signal assignment in the table corresponds to the pin assignment of the 4-pin
10/100BaseTX M12 socket of SCALANCE X208 PRO.
The pin assignment of the M12 socket of a network component on the other hand is as
follows:
Table 2- 2
Crossover pin assignment at one end of a crossover cable
Pin number
Assignment
Pin 1
TX+
White
Pin 2
RX+
Yellow
Pin 3
TX-
Blue
Pin 4
RX-
Orange
The difference is that the send pin at one end must connect to the receive pin at the other
end. With straight-through cables, this is only the case if the connector pin assignment is not
the same at both ends. With devices that have autocrossing, a transmission would work
even if the pin assignment was the same.