Siegenia MHS400 smart Assembly Instructions Manual Download Page 10

8

Last update: 17.12.2014

MHS400

Assembly instructions

1.5 Scope of delivery - Scheme C

Ordering data and part list - Scheme C

* Set consisting of 2 lift & slide drives, 1 infrared remote control incl. wall holder and emergency key

Accessories list - Scheme C 

(not included in scope of delivery)

Qty  Size by slide drive

Size range in mm Colour

Material number

1

MHS400 lift & slide system size 1 
(1 slide drive each on left and right)

2812 – 5506

RAL 9003 white

GMHS0040-000010*
(must be ordered using  
special order form)

Silver ~ RAL 9006

1

MHS400 lift & slide system size 2 
(1 slide drive each on left and right)

5507 – 8116

RAL 9003 white
Silver ~ RAL 9006

1

MHS400 lift & slide system size 3 
(1 slide drive each on left and right)

8117 – 13332

RAL 9003 white
Silver ~ RAL 9006

Item Qty Contents of slide drive SA box

Version

1

2

Slide drive SA

Including 24 V power supply

2

2

Catch

For slide drive SA

3

2

Catch base

For lift & slide sash top

4

2

Packer (2.5, 5, 8, 10 mm thick depending on profile system)

For catch on lift & slide sash top

5

2

Cover cap M

For catch

6

1

Cover profile SA (total length up to 7000 mm)

For slide drive SA

2

Cover profile SA with profile connector total length > 7000 mm

7

1

Cover cap SA left

For cover profile SA

8

1

Cover cap SA right

For cover profile SA

9

2

Cable sash (flat ribbon cable, 6-wire)

For slide drive SA - lift drive HA

10

24 Cable holder

Clip-on or screw-on

11

1

Mains cable with Euro plug

On slide drive SA, cable length 3.5 - 5 m

12

1

Terminal board

For connecting light curtain, only with 
MHS400-L

13

1

Assembly and operating instructions

Item Qty Contents of lift drives HA box
14

2

Lift drive HA

15

2

Fixing plate HA

For lift drives HA

16

2

Cover cap HA top

For lift drives HA

17

2

Cover cap HA bottom

For lift drives HA

18

8

Fixing screws M5 x 10 mm (incl. washers)

For fixing plates lift drives HA

19

4

Fixing screws M4 x 25 mm (incl. washers)

For cover caps HA top

20

2

Fixing screw M5 x 19 mm with square nut M5

For cover caps HA bottom

21

1

Emergency operating handle

Hexagon socket screw key WAF 8

Item Qty Contents of infrared remote control box
22

1

Infrared remote control

Including 2 batteries, type: AAA, micro or 
LR03

Item Qty

Description

Colour

Material number

23

1

Add. infrared remote control (incl. batteries)

-

GZFB0020-025010

24

1

Catch jig MHS400

-

GABB0010-0E5010

25

1

Through hole jig MHS400

-

GABB0020-0E5010

26

1

Rose lock

RAL 9003 white

GZRS0010-096010

Silver ~ RAL 9006 GZRS0010-025010

27

1

Rose lock cover

RAL 9003 white

GZRA0010-096010

Silver ~ RAL 9006 GZRA0010-025010

Summary of Contents for MHS400 smart

Page 1: ...HARDWARE DOOR HARDWARE SLIDING DOOR HARDWARE VENTILATION TECHNOLOGY BUILDING TECHNOLOGY BUILDING TECHNOLOGY MHS400 Motorised lift slide system for schemes A and C Assembly instructions ASSEMBLY INSTRU...

Page 2: ......

Page 3: ...ting in the lift slide sash 23 2 5 Assembly of the lift drive HA 27 2 6 Assembly of the slide drive SA Schema A 31 2 7 Concealed mains cable fitting and connection Scheme A 33 2 8 Assembly of the ligh...

Page 4: ...profile cylinder is not required Application The lift drive HA replaces the handle on the lift slide sash Driven by an electric motor it unlocks and lifts the lift slide sash via the lift slide hardw...

Page 5: ...sash with reference run on first operation of the MHS400 lift slide system High level of functional reliability Tested with 400 kg for more than 20 000 switching cycles Simple cable fitting with cable...

Page 6: ...059 mm to 6666 mm Sash height standard for HS PORTAL 1175 mm to 2675 mm Sash weight HS PORTAL 200 max 200 kg Sash weight HS PORTAL 300 max 300 kg Sash weight HS PORTAL 400 max 400 kg Max permissible s...

Page 7: ...ty Contents of slide drive SA box Version 1 1 Slide drive SA Including 24 V power supply 2 1 Catch On slide drive SA 3 1 Catch base For lift slide sash top 4 1 Packer 2 5 5 8 or 10 mm thick depending...

Page 8: ...00 Assembly instructions Component and accessories overview Scheme A Scopeofdeliveryofindividual components Accessories notincluded in scopeof delivery 11 1 2 3 4 5 7 8 10 10 22 9 16 15 14 19 18 17 13...

Page 9: ...h weight HS PORTAL 200 max 200 kg Sash weight HS PORTAL 300 max 300 kg Sash weight HS PORTAL 400 max 400 kg Max permissible sash weight for MHS400 lift slide drive max 400 kg Backset gear HS PORTAL 20...

Page 10: ...l length 7000 mm 7 1 Cover cap SA left For cover profile SA 8 1 Cover cap SA right For cover profile SA 9 2 Cable sash flat ribbon cable 6 wire For slide drive SA lift drive HA 10 24 Cable holder Clip...

Page 11: ...by lift slide sash Use profile connectors to connect the cover profiles SA on the left and right at and above total length of 7000 mm Scopeofdeliveryofindividual components Accessories notincluded in...

Page 12: ...systems The infrared remote control can control up to 5 drive groups separately With scheme C each lift slide sash can also be controlled individually To achieve this several MHS400 lift slide systems...

Page 13: ...ring lift slide elements make sure that no parts of the body or objects are under the lift slide sash Do not leave children unattended near a lift slide element Risk of injury or death due to electric...

Page 14: ...and electrical work must be complied with and the safety instructions in our product documentation must be followed Please read these assembly instruc tions carefully and in full before assembling and...

Page 15: ...mm plus 15 mm timber or metal drill Phillips screwdriver size 2 1 screwdriver bit 90 mm long 2 screw clamps Folding rule Router for timber elements Between 2 and 4 assembly racks Watch with second han...

Page 16: ...ermines the traverse path and the traverse forces of the lift slide sash automatically see operating instruc tions Prior to assembly clarify how the MHS400 system is to be controlled in addition to us...

Page 17: ...raverse path and the traverse forces of the lift slide sash automatically see operating instruc tions Prior to assembly clarify how the MHS400 system is to be controlled in addition to using the infra...

Page 18: ...e carried out before starting work For scheme A the concealed mains cable guide must always be located on the horizontal top section of the lift slide frame near the locking side For scheme C the conc...

Page 19: ...he cable outlet for scheme A is always at the top of the slide drive SA on the locking side Fig 1 for scheme C it can be located on the outside of the slide drive SA on either the left hand side or th...

Page 20: ...ty isolation is required if the customer is fitting the mains cable The isolated end of the mains cable must be located inside the power supply housing scheme A or 5 pin socket scheme C The connection...

Page 21: ...orizontally at the top noting the drilling diameter Fig 3 1 2 3 300 416 X 10 5 29 0 2 50 8 Positioning and drilling dimensions for the drilled holes for the catch on the lift slide sash fig for timber...

Page 22: ...lling to 15 mm Fig 5 and 6 The through hole can be drilled with the through hole jig MHS400 see Fig 6 this is available as an accessory Through holes do not have to be drilled for lift slide PVC and a...

Page 23: ...rive unit into the square mount on the lift slide hardware gear and align on the lift slide sash Fig 1 Mark the external edges of the fixing plate HA Fig 2 Take the lift drive HA off the fixing plate...

Page 24: ...lift drive HA to the fixing plate HA do not screw Insert the square of the drive unit into the square mount on the lift slide hardware gear and align on the lift slide sash Fig 1 Mark the external edg...

Page 25: ...he scope of delivery in the lift slide hardware gear and in the sash groove at the top of the lift slide sash The cable holders included in the scope of delivery clip into the lift slide hardware gear...

Page 26: ...Then secure with cable holders page 24 Fig 1 and 2 With timber elements the cable is fed through the through hole 15 mm Fig 6 WithPVCandaluminiumelements thecableis ifnecessary routedintothesashgroov...

Page 27: ...he sash groove can be milled 5 mm deeper on the horizontal sash timber at the top The bearing surface of the guides must not be altered In the case of retrofitting flat washers 20 mm and nails max 30...

Page 28: ...Fig 3 and pull back as far as a length of 50 mm Fig 5 Place the catch base and if applicable the packer depending on profile included in scope of delivery on the sash Fig 4 Use cable holders to secure...

Page 29: ...read M5 on recessed pull handles by other manufacturers can in some cases prevent manual operation with the emergency operating handle In such cases the recessed pull handle must be replaced with the...

Page 30: ...f the drive unit Fig 2 Attaching and screwing on the cover caps HA Unscrew the two screws in the centre of the drive unit then set the top half of the cover cap HA down on the fixing plate HA and care...

Page 31: ...handle cover for example can be covered with the lock cover rose 27 which is available as an accessory A 27 Countersunk bolts St 2 9 x 11 mm Option B Lift slide sash with cylinder lock cylinder lock...

Page 32: ...profile Position the rose lock 26 accessory on the lift slide sash underneath the lift drive HA and fix in place with 2 countersunk bolts St 2 9 x 11 mm included in scope of delivery Fig 1 For alumin...

Page 33: ...e by 2 mm see Fig A 2 mm 2 mm 2 mm A Fig for positioning DIN left DIN right is a mirror image Inside frame edge External edge mounting angle Frame inside edge slide drive SA Cover caps SA Cowl length...

Page 34: ...to the mounting angle at screw level A or B Fig 1 Set the catch down on the catch base and screw on with suitable screws Fig 2 see the table on page 13 Connect the cable sash flat ribbon cable 6 wire...

Page 35: ...the power supply cover Fig 1 Disassemble and remove the plug cable that comes as standard in the power supply Fig 2 Run the concealed mains cable through the notch in the mounting angle and into the p...

Page 36: ...Modifications to the MHS400 system are required for operation with a light curtain On the slide drive SA a jumper must be switched for operation with a light curtain Terminal board for connecting lig...

Page 37: ...ccount when measuring the inside frame width Each RIB must be calculated individually for the left hand slide drive SA dimension 1 and the right hand slide drive SA dimension 2 To check that the measu...

Page 38: ...wed on as appropriate for the installation situation of the lift slide profile system concerned see Chapter 4 Fixing the slide drives SA to the mounting angle at screw level A or B Fig 1 Set the catch...

Page 39: ...ng Fig 6 Attach the cover profile SA to the mounting angle Fig 7 Use profile connectors to connect the cover profiles on the left and right at and above total length of 7000 mm Fig 8 Press down on the...

Page 40: ...ug Fig 1 Unplug and remove the 2 wire mains plug cable that comes as standard in the power supply Fig 2 Route the concealed mains cable through the open cable duct clips open and shut and cable duct r...

Page 41: ...11 Assembly of the light curtain Scheme C Modifications to the MHS400 system are required for operation with a light curtain On the slide drive SA a jumper must be switched for operation with a light...

Page 42: ...the lift slide element following assembly of the MHS400 system e g changes to stoppers end pieces etc Seals on lift slide element too stiff or not fitted correctly Seal lip is rubbing against the gui...

Page 43: ...on the following pages Screw levels Mounting angle for slide drive SA shown without drive unit A B Adjustment dimension X The dimension X represents the set value for the height clearance between the...

Page 44: ...01 02 Timber element with guide rail KH 0130 01 X A 56 171 20 7 18 5 73 11 45 34 91 68 107 68 92 47 25 72 Screw level A Dimension X 29 mm Packer 8 mm Reinforcement None Use flat washers see Chapter 2...

Page 45: ...pdate 17 12 2014 43 Assembly instructions MHS400 Timber element with guide rail HH 03 56 212 92 107 92 92 34 118 18 7 X 36 Screw level A Dimension X 25 mm Packer None Reinforcement None Guide rail HH0...

Page 46: ...KF element Aluplast HST 4000 KF element Aluplast Ideal A 73 72 47 25 45 7 22 5 25 X Screw level A Dimension X 37 mm Packer None Reinforcement None Run flat ribbon cable through profile chamber Profil...

Page 47: ...embly instructions MHS400 KF element Inoutic KF element Gealan S 8000 X 45 30 Screw level A Dimension X 31 mm Packers None Reinforcement None X B 73 20 45 47 25 5 72 Screw level B Dimension X 31 mm Pa...

Page 48: ...45 10 40 15 10 t 50 10 22 73 Screw level A Dimension X 44 mm Packer 10 mm Reinforcement None Profile with cover Insert screw on accessory Screw on accessory made from Packer X A 27 47 72 45 25 22 5 7...

Page 49: ...0 KF element Salamander Design iD KF element Sch co Corona CT 70 HS A 72 47 29 29 5 45 12 73 X Screw level A Dimension X 29 mm Packer None Reinforcement None B 72 15 47 25 45 20 11 12 1 73 X Screw lev...

Page 50: ...element Rehau S 785 Brilliant Design X A 72 47 25 45 40 11 5 13 5 73 Screw level A Dimension X 39 mm Packers 8 mm 5 mm Reinforcement None Profile with cover Packers X B 72 47 25 20 45 5 11 73 Screw le...

Page 51: ...e KF element Veka Topline and Softline 70 B 72 47 25 9 5 18 45 15 73 X Screw level B Dimension X 35 mm Packer None Reinforcement None A 72 47 25 19 5 10 45 73 28 X Screw level A Dimension X 29 mm Pack...

Page 52: ...tructions KF element Veka Slide 70 KF element Thyssen Polymer 50 25 165 90 X 5 6 29 5 26 5 Screw level A Dimension X 32 mm Packer None Reinforcement None A 9 72 47 25 23 5 6 45 73 X Screw level A Dime...

Page 53: ...top for aluminium elements LM element ALCOA RT 135 LM element Alcoa Kawneer 3572 11 5 72 47 25 12 20 45 73 Screw level B Dimension X 35 mm Packer 5 mm Reinforcement None Note doubling up Packer Doubl...

Page 54: ...Hueck 5 2 72 47 25 14 20 45 73 Screw level B Dimension X 35 mm Packer 5 mm Reinforcement None Profile with cover Note doubling up Packers Doubling up X B 72 47 25 10 20 45 73 Screw level B Dimension X...

Page 55: ...LM element Heroal 070 LM element Heroal S77 Hi X B 15 72 47 25 20 10 45 73 Screw level B Dimension X 36 mm Packer None Reinforcement None Note doubling up Doubling up 77 24 X 11 6 14 6 14 6 Screw lev...

Page 56: ...instructions LM element Reynaers CP 130 LM element Reynaers CP 155 LS Duorail 5 5 X 25 40 Screw level A Dimension X 54 mm Packer 5 mm Reinforcement None X B 7 72 47 25 10 20 45 73 Screw level B Dimens...

Page 57: ...5 2 5 8 X 21 Reinforcement 2x38 mm Screw level B Dimension X 38 mm Packer 2 5 mm Reinforcement None X B 8 8 12 72 47 25 20 20 45 73 Screw level B Dimension X 37 mm Packer 8 mm Reinforcement None Inser...

Page 58: ...lement Sch co ASS 70 HI formerly Royal S 160 HI B 14 7 5 72 47 25 16 20 45 73 X Screw level B Dimension X 37 mm Packer 5 mm Reinforcement None Profile with cover Note doubling up Doubling up Packer X...

Page 59: ...element Wicona WSL 160 LM element Wicona Wicslide 23 160 10 X 50 8 14 5 Screw level A Dimension X 39 mm Packer 5 mm Reinforcement None X B 5 18 10 72 47 25 3 20 45 73 Screw level B Dimension X 35 mm...

Page 60: ...58 Last update 17 12 2014 MHS400 Assembly instructions LM element Aluprof MB 77 77 X 15 33 45 174 Screw level A Dimension X 34 mm Packer None Reinforcement None...

Page 61: ...are warranted for a period of two years subject to correct installation and proper use in accordance with statutory provisions As part of our ongoing improvements we reserve the right to replace indiv...

Page 62: ...rotocol 14 315 The machine may only be put into operation when incomplete if it has been ascertained if applicable that the machine into which the incomplete machine is to be installed conforms to the...

Page 63: ......

Page 64: ...elux Phone 32 9 2811312 China Phone 86 316 5998198 France Phone 33 3 89618131 Germany Phone 49 271 39310 Great Britain Phone 44 2476 622000 Hungary Phone 36 76 500810 Italy Phone 39 02 9353601 Poland...

Reviews: