7
MAINTENANCE AND REPAIR
58
8025140/2020-02-03|SICK
T R A N S L A T I O N O F T H E O R I G I N A L O P E R A T I N G I N S T R U C T I O N S | VMS6200
Subject to change without notice
7.1
Monitoring and cleaning work
7.1.1
Control measurements
▸
Ensure proper functioning of the VMS6200 by means of regular controls.
▸
To do so, check the measurement accuracy of the volume measurement system using
defined test objects.
▸
If any unexpected deviations are found, check the volume measurement system for
mechanical damage.
▸
Should the volume measurement system show signs of mechanical damage, contact
SICK Service.
▸
Place the reference object
in a centered position
on a conveyor element.
NOTE!
The volume measurement systems need to be able to detect the entire
reference object when it passes the laser line.
▸
Make sure that the reference object does not change its spatial position when passing
the laser line.
7.1.2
Visual control
▸
Regularly check the conveying equipment for damage or contamination.
▸
Replace any damaged belt elements immediately.
▸
Check the electrical installation regularly.
▸
Make sure that all cable connections are secure.
▸
Replace any damaged connecting cables immediately.
Operational check
of the volume
measurement
Visual inspection of the
conveying equipment
Visual inspection of
the cables