4.7.5
Drilling holes into the pipeline if plant is in operation (hot tap)
▸
Only once on each nozzle.
▸
The hole cutter diameter must be 46 ... 48 mm for 2“ nozzles.
▸
Mount the drilling tool on the ball valve.
▸
Open the ball valve and drill out the holes in the pipeline in the center of the nozzle
position.
▸
Retract the drilling tool.
▸
Close the ball valve again. Then, remove the drilling tool.
▸
Mount a blind flange on the ball valve as long as no sender/receiver unit is installed.
WARNING:
Hazards during hot tapping
When sender/receiver units are installed on the pipeline when the pipeline is in
operation (hot tapping):
▸
Only have this work done by skilled persons qualified for hot tapping.
▸
Comply with all legal, general and company-internal regulations.
▸
Only start installation work when all planned measures have been checked
and approved by the plant operator.
WARNING:
Accident risk
When the hole has been drilled and no sender/receiver unit has been installed:
Gas flows through the pipeline when the ball valve is opened.
▸
Keep the ball valve closed and fitted until a sender/receiver unit has been
fitted.
▸
Secure the ball valve against unintentional activation.
▸
Instruct other persons accordingly.