Page
All Rights Reserved Shyam Telecom Limited 19/36
Next Generation
Signal Enhancement
3. The UL Align indication LED and DL align indication LEDs will blink for
adjusting the DL gain and UL gain automatically.
4. Review the intended coverage area according to the site installation
plan. Using a mobile NOKIA handset loaded with NET engineering
software and the SIM card of cellular operator, measure and monitor
the signal level at various points within and around the perimeter of the
coverage area.
i.
Ensure that antenna connectors and antenna cable connectors are
clean and dry.
ii.
The RF cables must not be kinked, cut or damaged in any way.
iii.
Connect the RF cables to the antennas taking care to avoid cross
threading or stripping. The RF connections should be snug and tight.
iv.
Seal the antenna and repeater connectors with waterproof sealant or
the appropriate weather tight boot.