.
Page
All Rights Reserved
Shyam Telecom Limited
5/43
Next Generation
Signal Enhancement
I
ntentionally
L
eft
B
lank
2.
D
isclaimer
Every attempt has been made to make this material complete, accurate, and
up-to-date. Users are cautioned, however, that Shyam Telecom Limited
reserves the right to make changes without notice and shall not be
responsible for any damages including consequential, caused by reliance of
the contents presented, including, but not limited to, typographical,
arithmetical, or listing errors.
Product name(s) referenced in this document may be trademarks or
registered trademarks of their respective companies, and are hereby
acknowledged.
In areas with unstable power grids (mains) all repeaters must be installed with
a voltage regulator ensuring a constant voltage level at the repeater power
input. A maximum voltage deviation should remain within the input range to
the repeaters for warranty purposes.
All antennas must be installed with lightening protection. Damage to internal
modules, as a result of lightening is not covered by the warranty.
All specifications are subject to change without prior notice.