.
Page
All Rights Reserved
Shyam Telecom Limited
37/43
Next Generation
Signal Enhancement
8.8.
C
hecklist –
P
ost
I
nstallation
A
fter the installation of the system is accomplished, points as indicated in the
checklist are verified.
S
ervice
B
ands
P
articulars:
F
requency
B
and for
B
and
1 DL
F
requency
B
and for
B
and
1 UL
F
requency
B
and for
B
and
2 DL
F
requency
B
and for
B
and
2 UL
A. R
epeater
I
nstallation
S.N
O.
P
oint(s)
T
o be
V
erified
R
emarks
1. E
nsure isolation between server and donor
antennas, it has to be
15
d
B
+
G
ain set of the
repeater.
2. A
ctual isolation measured
3. E
nsure proper grounding of the unit
4. C
able from donor antenna connected to donor
antenna port
5. C
able from server antenna connected to the
relevant port in the unit
6. M
ains cable connected to the repeater unit
7. C
able protection ensured and outdoor connections
are waterproof
Remarks
Point(s) to be Verified
S. No.