1. Open both rolls of felt, fold in half and cut 
to produce 4 equal lengths. 

 

2. Starting at the lower edge of the roof (the 
eaves) place one piece of felt along the 
length of the building allowing an overhang of 
approx. 50 mm on all sides. Secure the felt 
using felt nails spaced at approx 100mm  
intervals, but do not nail along the centre of 
the roof until the next piece of felt covering 
the ridge is in place. Repeat for other side. 
3. Place the third piece of felt along the length 
of the building overlapping the first piece and 
the ridge. Secure using felt nails spaced at 
approx 100 mm intervals. Repeat for other 
side. 

 

4. Carefully trim the corners and secure using 
2 x felt nails at each side. 

 

1. Fix cover strips at the corners and where 
panels meet using 4 x 40 mm nails per strip. 

 

1. Secure wall panels to the floor on the  
inside of the building through framework into 
floor bearers using 2 x 60 mm screws per 
panel. 

 

 

1. Secure the profiled fascia to front gable 
end using 3 x 40 mm nails per piece. 
Secure plain fascia to back gable using 3 x 40 
mm nails per piece. 
2. Trim off any excess felt with cutting knife 
against edge of fascia board. 

 

3. Fix diamond on top of and in the centre of 
the fascia board using 2 x 40 mm nails per 
diamond. 

 

1. Place glazing material into the aperture of 
each window. 
2. Hold glazing in position with four pieces of 
beading. Secure beading in position using 2 x 
15 mm panel pins per piece of beading. 
Repeat for all window apertures. 
 

 

 

1. Place ring handle 
halfway up the door 
making sure you are 
central to door bearer. 
Mark the holes. Join 
holes with a marker to 
find the centre. Drill 
centre point only. 
2. Place wooden  
handle on the inside 
of the door and screw 
from the outside using 
the hole just drilled 
and 1 x 45 mm flat 
head screw.  
3. Secure ring handle using 4 x 25 mm black 
screws. 

 

 

1. Attach the ladder to the upstairs floor using 
2 x 60 mm screws and attach to the ground 
floor using 2 x 60 mm screws. 

 

2. Push fit vents into the apertures of the back 
gable panel. 

H  Felt Roof 

I  Cover Strips 

J  Secure Walls to Floor 

K  Fascia & Diamonds 

L  Gazing 

M  Door Knob Assembly 

N  Ladder & Vents 

Assembly Completion Checklist

 

1

  Check and ensure that no raised grain or splinters 

are evident on timber components. Sand down any 
raised grain or splinters using fine grade sandpaper.                                                                                             

2

  Check that all screw, nail and pin heads are properly 

tapped home and are not proud of the timber surface.  

3

 Check and ensure that no screws, nails or pins  

   protrude through any panel. 
4 Check and ensure that all parts are properly  secured 

against reasonable force.         

5

 Do not apply decorative wood finish/treatments to wet 

or damp timber. Please observe the instructions of 
the wood finish/treatment manufacturer.  

Adults need to check the playhouse regularly and 

maintain the playhouse in good condition to provide a 
safe environment. Do not use if damaged. If damaged 
the playhouse should be properly and safely repaired 
before further use by children. 

AA

 

Summary of Contents for Lodge Playhouse

Page 1: ...nob 2 Vents 2 Fascia profiled 2 Fascia plain 2 Diamonds 52 80mm screws 104 60mm screws 1 45mm flat head screw 4 25mm black screws 50 40mm nails 250 Felt nails 192 15mm panel pins 2 Felt roll 6 4mtr x 1mtr Thank you and congratulations on the purchase of your Shire garden building We believe that this product will give you many years of excellent service This is a natural product manufactured to a ...

Page 2: ...at for other side rail 1 Place two 44 x 70 x 889 mm pieces of framework on a flat level surface The 44 mm side will be facing upwards Position two 44 x 70 x 1319 mm of framework inside the 889 mm pieces Secure together using 8 x 80 mm screws two per end 2 Secure front rail within the frame as per side rail 3 Repeat for other front rail 1 Position verandah floor against front of building 2 Place si...

Page 3: ...railing using 2 x 60 mm screws one at the top and one at the bottom Repeat for other side of railing 6 Place front gable onto upstairs floor Secure through panel framework into floor using 8 x 60 mm screws Secure to small side panels using 2 x 60 mm screws per side 1 Slide large back roof panel into position using the cut out at the ridge of the back gable and the cut out in the side panel as a gu...

Page 4: ...sition using 2 x 15 mm panel pins per piece of beading Repeat for all window apertures 1 Place ring handle halfway up the door making sure you are central to door bearer Mark the holes Join holes with a marker to find the centre Drill centre point only 2 Place wooden handle on the inside of the door and screw from the outside using the hole just drilled and 1 x 45 mm flat head screw 3 Secure ring ...

Reviews: