1. Open both rolls of felt, fold in half and cut
to produce 4 equal lengths.
2. Starting at the lower edge of the roof (the
eaves) place one piece of felt along the
length of the building allowing an overhang of
approx. 50 mm on all sides. Secure the felt
using felt nails spaced at approx 100mm
intervals, but do not nail along the centre of
the roof until the next piece of felt covering
the ridge is in place. Repeat for other side.
3. Place the third piece of felt along the length
of the building overlapping the first piece and
the ridge. Secure using felt nails spaced at
approx 100 mm intervals. Repeat for other
side.
4. Carefully trim the corners and secure using
2 x felt nails at each side.
1. Fix cover strips at the corners and where
panels meet using 4 x 40 mm nails per strip.
1. Secure wall panels to the floor on the
inside of the building through framework into
floor bearers using 2 x 60 mm screws per
panel.
1. Secure the profiled fascia to front gable
end using 3 x 40 mm nails per piece.
Secure plain fascia to back gable using 3 x 40
mm nails per piece.
2. Trim off any excess felt with cutting knife
against edge of fascia board.
3. Fix diamond on top of and in the centre of
the fascia board using 2 x 40 mm nails per
diamond.
1. Place glazing material into the aperture of
each window.
2. Hold glazing in position with four pieces of
beading. Secure beading in position using 2 x
15 mm panel pins per piece of beading.
Repeat for all window apertures.
1. Place ring handle
halfway up the door
making sure you are
central to door bearer.
Mark the holes. Join
holes with a marker to
find the centre. Drill
centre point only.
2. Place wooden
handle on the inside
of the door and screw
from the outside using
the hole just drilled
and 1 x 45 mm flat
head screw.
3. Secure ring handle using 4 x 25 mm black
screws.
1. Attach the ladder to the upstairs floor using
2 x 60 mm screws and attach to the ground
floor using 2 x 60 mm screws.
2. Push fit vents into the apertures of the back
gable panel.
H Felt Roof
I Cover Strips
J Secure Walls to Floor
K Fascia & Diamonds
L Gazing
M Door Knob Assembly
N Ladder & Vents
.
Assembly Completion Checklist
1
Check and ensure that no raised grain or splinters
are evident on timber components. Sand down any
raised grain or splinters using fine grade sandpaper.
2
Check that all screw, nail and pin heads are properly
tapped home and are not proud of the timber surface.
3
Check and ensure that no screws, nails or pins
protrude through any panel.
4 Check and ensure that all parts are properly secured
against reasonable force.
5
Do not apply decorative wood finish/treatments to wet
or damp timber. Please observe the instructions of
the wood finish/treatment manufacturer.
6
Adults need to check the playhouse regularly and
maintain the playhouse in good condition to provide a
safe environment. Do not use if damaged. If damaged
the playhouse should be properly and safely repaired
before further use by children.
AA