background image

16165

Call Us First!

DO NOT RETURN TO STORE.

For questions on assembly or for general inquiries, you may contact us in the following ways:

Call customer service:

 1-877-743-3400

Did you enjoy building your shed? 

JOIN OUR TEAM

AND MAKE UP TO $1,500/WEEK*

o

r

 

vis

i

t b

a

cky

ard

in

st

a

l

l

er.

co

m

Flexible schedule 

No selling,

just building

Bonus incentives 

available

S

ca

n

 th

f

 owc

o

de 

t

a

p

ply 

to

d

a

y

.

INSTALLERS

WANTED

*based on number of completed installations

Call a Recruiter Today!  734-365-7000

visit us online at

help.backyardproducts.com

AVOID THE WAIT!

Submit a help request
Answers to frequently asked questions
Live chat with an agent

Summary of Contents for STILLWATER

Page 1: ...AM AND MAKE UP TO 1 500 WEEK o r v i sit backyardinstaller c o m Flexible schedule No selling just building Bonus incentives available S c a n t he f lowcode to apply t o d a y INSTALLERS WANTED based on number of completed installations Call a Recruiter Today 734 365 7000 visit us online at help backyardproducts com AVOID THE WAIT Submit a help request Answers to frequently asked questions Live c...

Page 2: ... This page intentionally left blank ...

Page 3: ...its SURFACE PREPARATION To ensure proper assembly you must build your shed on a level surface Recommended methods and materials to level your shed are listed on page 11 CHECK ALL PARTS Inventory all parts listed on pages 3 6 ADDITIONAL MATERIALS You will need additional materials to complete your shed See pages 7 8 for required and optional materials and quantities CONTACT OUR CUSTOMER SERVICE TEA...

Page 4: ... assembly or installation Level Gloves Framing lumber is graded for structural strength and not appearance Exterior trim is graded for one good side Always install the material leaving the best edge and best surface visible Please remember that these blemishes in no way negatively affect the strength or integrity of our product See Fig A B C A Safety Glasses Tape Measure Paint Tools Ladder Caulk G...

Page 5: ...tamp WOOD SIZE CONVERSION CHART Nominal Board Size Actual Size 1 x 4 3 4 x 3 1 2 1 9 x 8 9 cm 2 x 4 1 1 2 x 3 1 2 3 8 x 8 9 cm 2 x 3 1 1 2 x 2 1 2 3 8 x 6 3 cm 1 x 3 3 4 x 2 1 2 3 8 x 6 3 cm RS RS RS GAMBREL 10 x 10 PARTS LIST INVENTORY YOUR PARTS before you begin We suggest sorting parts by the category they are listed in 10x10 ZJ x1 19 32 x 2 1 2 x 72 1 5 x 6 3 x 182 9 cm OO x2 69 175 3 cm Door ...

Page 6: ...ARE EDGE x1 3 8 x 48 x 48 1 x 121 9 x 121 9 cm x1 3 8 x 48 x 48 1 x 121 9 x 121 9 cm x1 3 8 x 48 x 48 1 x 121 9 x 121 9 cm x1 3 8 x 48 x 48 1 x 121 9 x 121 9 cm x1 3 8 x 23 7 8 x 52 1 4 1 x 60 6 x 132 7 cm x1 3 8 x 23 7 8 x 50 13 16 1 x 60 6 x 129 1 cm x2 48 x 96 121 9 x 243 8 cm x2 23 7 8 x 96 60 6 x 243 8 cm x2 23 7 8 x 48 60 6 x 121 9 cm x2 23 7 8 x 23 7 8 60 6 x 60 6 cm x2 15 7 8 x 23 7 8 40 3...

Page 7: ...ctual Size 3 7 6 cm 2 5 1 cm x3 BOXES x5 BOXES NOTE If you are using a nail gun nails may be used where screws are shown for quicker assembly Length of nail must match screw length Not included in base kit 64 Metal Threshold x1 Other HARDWARE Not Actual Size 3 4 1 9 cm x8 x1 1 1 2 3 8 cm x2 x2 3 4 1 9 cm x11 Bagged separately special coating 16 x 8 x2 1 2 13 mm x12 ...

Page 8: ...part stamp RS RS WOOD SIZE CONVERSION CHART Nominal Board Size Actual Size 1 x 4 3 4 x 3 1 2 1 9 x 8 9 cm 2 x 4 1 1 2 x 3 1 2 3 8 x 8 9 cm 2 x 3 1 1 2 x 2 1 2 3 8 x 6 3 cm 1 x 3 3 4 x 2 1 2 3 8 x 6 3 cm 3 7 6 cm x12 HARDWARE 3 8 x 48 x 72 1 x 121 9 x 182 9 cm x2 x1 1 x 3 x 96 2 5 x 7 6 x 243 9 cm BE x4 2 x 4 x 68 5 1 x 10 2 x 172 7 cm UM x4 2 x 4 x 68 3 8 5 1 x 10 2 x 173 7 cm JJA x2 47 7 8 x 48 1...

Page 9: ...ONAL MATERIALS If your shed came with a separate floor kit then please use the instructions supplied with that kit to assemble your floor See the FLOOR LEVELING section on page 11 for recommended methods and suggested materials to properly level your floor as this will vary depending on your specific site If you choose to install your floor on a concrete slab refer to page 9 If you choose to build...

Page 10: ...B SHINGLES Bundles PAINT FOR SIDING Gallons Use 100 acrylic latex exterior paint 1 galvanized roofing nails lbs For shingles Paint for trim Quart Use 100 acrylic latex exterior paint Caulk Tubes Use acrylic paintable latex exterior caulk 6 2 3 10x10 1 3 10x10 2 coats recommended Drip Edge Feet 15 Roofing Felt Sq ft to cover 1 Galvanized Roofing Nails lbs For roofing felt 8 3 4 10x14 1 4 10x14 60 1...

Page 11: ...uded Check local code for concrete foundation requirements 120 304 8 cm 120 304 8 cm 113 287 cm 161 408 9 cm 10 x10 304 8 x 304 8 cm 10 x 14 304 8 x 408 9 cm 10 x10 304 8 x 304 8 cm 10 x14 304 8 x 408 9 cm 120 304 8 cm 169 11 16 476 1 cm 168 426 7 cm 206 7 16 524 4 cm 10 x 10 Building Requires 10 x 14 Building Requires 2 x 4 x 10 5 1 x 10 2 x 304 8 cm x2 2 x 4 x 10 5 1 x 10 2 x 287 cm x2 2 x 4 x 1...

Page 12: ... x 243 8 cm x5 x1 x2 x36 x48 x54 x72 1 lb of 2 5 1 cm Hot Dipped Galvanized Box Type Nails 1 lb of 2 5 1 cm Hot Dipped Galvanized Box Type Nails 3 7 6 cm Hot Dipped Galvanized Box Type Nails 40 Nails 3 7 6 cm Hot Dipped Galvanized Box Type Nails 3 7 6 cm 3 7 6 cm 2 5 1 cm 2 5 1 cm 3 7 6 cm 3 7 6 cm MATERIAL REQUIRED MATERIAL REQUIRED 4 x 4 x 10 10 2 x 10 2 x 304 8 cm Cut to 3 4 x 4 x 48 10 2 x 10 ...

Page 13: ... wood treated for ground contact and fasteners approved for use with treated wood Always support frame seams Level under 4x4 runners only Locate leveling material 12 from ends of runners and no more than 48 apart Asphalt shingles should be used between 4x4 runners and blocks or treated lumber Never use shingles in direct contact with ground For best results and aiding in water drainage use gravel ...

Page 14: ...4 x 120 5 1 x 10 2 x 304 8 cm PARTS REQUIRED Center on marks 10 x 10 FLOOR FRAME Flush Flush Look for Stamp TREATED HINT For easier nailing stand on frame Arrange parts as shown on flat surface Measure and mark Secure with 2 3 nails at each mark Your floor frame is now assembled Proceed to level and square the frame page 14 FINISH You will need to cut 120 boards down to 117 BEGIN 1 ...

Page 15: ... 10 2 x 297 2 cm x2 2 x 4 x 168 5 1 x 10 2 x 426 7 cm PARTS REQUIRED Center on marks 10 x 14 FLOOR FRAME Flush Flush Look for Stamp TREATED HINT For easier nailing stand on frame Arrange parts as shown on flat surface Measure and mark Secure with 2 3 nails at each mark Your floor frame is now assembled Proceed to level and square the frame FINISH You will need to cut 120 boards down to 117 BEGIN 1...

Page 16: ...uct your shed After the frame is level and square secure one side of frame to 4x4 runners using one fastener at ends of each runner At the opposite end of the frame secure the frame to 4x4 runners with one fastener at the ends of each runner ensuring that the frame remains square Fasten the frame to the 4x4 runners with 2 3 screws at each connection Fig A 2 BEGIN 1 Use a level and ensure the frame...

Page 17: ...ls with 2 nails spaced 6 apart on edges and 12 apart inside panels 3 4 Gauge Block 3 4 Gauge Block 3 4 Gauge Block For squareness maintain 3 4 measurement along panel edge BEGIN HERE 3 4 1 9 cm 6 15 2 cm 12 30 5 cm Flush Flush 23 7 8 x 48 48 x 96 48 x 96 23 7 8 x 48 23 7 8 x 96 23 7 8 x 23 7 8 Flush Flush Flush Flush Flush Flush Flush Flush 3 4 GAUGE BLOCK Place 1 48 x 96 panel on frame flush to e...

Page 18: ...edges and 12 apart inside panels 3 4 Gauge Block 3 4 Gauge Block BEGIN HERE 3 4 1 9 cm 6 15 2 cm 12 30 5 cm 23 7 8 x 72 23 7 8 x 48 48 x 72 48 x 96 47 7 8 x 48 23 7 8 x 96 Flush Flush Flush Flush Flush Flush Flush Flush Flush 3 4 GAUGE BLOCK Place 1 48 x 96 panel on frame flush to edges Use GAA as a gauge block to maintain the 3 4 measurement on the floor joist Secure the panel with 2 nails spaced...

Page 19: ...nstruction Organize your assembly procedure during the build process to avoid over handling of the walls HINT D O O R EAVE WALL EAVE WALL GABLE WALL GABLE WALL GABLE WALL Ensure the floor frame is level after installing floor panels Re level if needed NOTE 10 x 10 floor shown as an example ...

Page 20: ...tallation 10 x 14 After assembling the walls for your 10 x 14 shed go to page 33 for wall installation 10 x 10 Wall 01 Page 20 Wall 02 Page 22 Wall 03 Page 24 Build 2 eave walls 10 x 14 Wall 01 Page 20 Wall 02 Page 22 Wall 04 Page 26 Build 2 eave walls WALL INDEX 01 01 02 02 03 04 03 04 ...

Page 21: ...the long edge of the panel as a lever move the panel side to side until you have a 3 4 measurement on the wall stud Secure corner with 2 2 nails Fig B 3 4 Gauge Block x1 3 8 x 48 x 72 1 x 121 9 x 182 9 cm For squareness maintain 3 4 and 1 1 2 measurement along panel edge BEGIN HERE 3 4 1 9 cm 6 15 2 cm 12 30 5 cm 3 4 GAUGE BLOCK GAA WALL PANEL INSTALLATION HINTS EXAMPLES BEGIN 1 Angle nail to draw...

Page 22: ... BEGIN x6 2 x 4 x 68 5 1 x 10 2 x 172 7 cm UM RR RR TJ DPD UM x6 Flush Flush Flush Flush Seam Arrange parts on edge on floor as shown Measure and mark from end of boards Secure with 2 3 nails at each connection and 4 3 nails at seam Seam 64 162 6 cm x1 2 x 4 x 92 5 8 5 1 x 10 2 x 235 3 cm TJ 2 x 4 x 27 3 8 5 1 x 10 2 x 69 5 cm x1 DPD 2 x 4 x 28 5 1 x 10 2 x 71 1 cm x2 RR 3 7 6 cm Nails ...

Page 23: ... Screw 3 4 1 9 cm x1 69 75 3 cm Door Stiffener OO Temporary Brace Install the left and right 11 7 8 x 72 panels flush panels flush to the top plate and flush to installed panels Secure panels with 2 nails spaced 6 apart on edges Note the panel lip edge square edge orientation Flush Flush Flush Flush 3 Your gable wall 01 with door is now assembled Carefully flip the wall over FINISH LIP EDGE LIP ED...

Page 24: ...REQUIRED x6 x2 x2 x28 2 x 4 x 24 5 1 x 10 2 x 61 cm RL 2 x 4 x 68 5 1 x 10 2 x 172 7 cm UM 2 x 4 x 96 5 1 x 10 2 x 243 8 cm TP RL TP RL TP UM x6 1 BEGIN Arrange parts on edge on floor as shown Measure and mark from end of boards Secure with 2 3 nails at each connection and 4 3 nails at seams HINT Flush Flush Flush Flush Seam Seam 3 7 6 cm Nails ...

Page 25: ...ARE EDGE SQUARE EDGE Install 1 48 x 72 panel flush to the top plate Secure panel with 2 nails spaced 6 apart on edges and 12 inside panel Note the panel lip edge square edge orientation 2 Install 1 48 x 72 and 1 23 7 8 x 72 panel flush to installed panels Secure with 2 nails spaced 6 apart on edges and 12 apart inside panel Note the panel lip edge square edge orientation 3 23 7 8 x 72 60 6 x 182 9...

Page 26: ...M x6 1 BEGIN 10 EAVE WALL 03 3 7 6 cm x28 Seam Seam 3 7 6 cm Nails JBD TJ Build two identical walls HINT Arrange parts on edge on floor as shown Measure and mark from end of boards Secure with 2 3 nails at each connection and 4 3 nails at seams x6 2 x 4 x 68 5 1 x 10 2 x 172 7 cm UM 2 x 4 x 20 3 8 5 1 x 10 2 x 51 8 cm x2 JBD x2 2 x 4 x 92 5 8 5 1 x 10 2 x 235 3 cm TJ ...

Page 27: ...e edge orientation 2 Install 1 48 x 72 and 1 23 7 8 x 72 panel flush to installed panels Secure with 2 nails spaced 6 apart on edges and 12 apart inside panel Note the panel lip edge square edge orientation 3 48 x 72 121 9 x 182 9 cm x2 3 1 2 8 9 cm Flush Flush 23 7 8 x 72 60 6 x 182 9 cm x1 23 7 8 60 6 cm Your 10 eave walls are now assembled Carefully flip the wall over Repeat all steps to build ...

Page 28: ...cm HINT 1 BEGIN 14 EAVE WALL 04 3 7 6 cm x36 PARTS REQUIRED Build two identical walls Arrange parts on edge on floor as shown Measure and mark from end of boards Secure with 2 3 nails at each connection and 4 3 nails at seams UM x8 TJ JJA JJA TJ Seam 3 7 6 cm Nails Seam x8 2 x 4 x 68 5 1 x 10 2 x 172 7 cm UM x2 2 x 4 x 92 5 8 5 1 x 10 2 x 235 3 cm TJ x4 2 x 4 x 68 3 8 5 1 x 10 2 x 173 7 cm JJA ...

Page 29: ...ISH Install 1 48 x 72 panel 1 1 2 from the top plate Secure panel with 2 nails spaced 6 apart on edges and 12 inside panel Note the panel lip edge square edge orientation 2 Install 2 48 x 72 and 1 23 7 8 x 72 panels flush to installed panels Secure with 2 nails spaced 6 apart on edges and 12 apart inside panel Note the panel lip edge square edge orientation 3 Flush Flush Flush Flush Flush Flush SQ...

Page 30: ...28 STANDING YOUR WALLS The following steps show how to stand and secure your walls for a 10 x 10 shed For a 10 x 14 shed start on page 33 ...

Page 31: ... cm 3 7 6 cm Screws Secure lower edge of panel to floor frame with 2 nails spaced 6 apart Angle nails into floor frame Fig A Secure wall bottom plates to floor with 3 nails Fig A 2 Your 10 gable wall 02 is now standing FINISH Install OO as a temporary brace Secure with 2 3 screws 6 15 2 cm D O O R D O O R Nail 2 nails first 2 5 1 cm Nails 3 7 6 cm Nails Fig A OO x1 69 175 3 cm Door Stiffener Tempo...

Page 32: ...part Angle nails into floor frame Fig C Nail panel to 10 wall stud with 1 1 2 nails spaced 6 apart ENSURE PANEL CORNERS ARE FLUSH Your 1st eave wall 03 is now installed FINISH 2 5 1 cm x23 1 1 2 3 8 cm x13 2 5 1 cm x2 PARTS REQUIRED 2 5 1 cm Nails 1 1 2 3 8 cm Nails Flush 6 15 2 cm 6 15 2 cm 2 5 1 cm Screw Fig B 2 5 1 cm Screw Fig A Nail 2 nails first 2 5 1 cm Nails 3 7 6 cm Nails Fig C Secure wal...

Page 33: ...s spaced 6 apart Angle nails into floor frame Fig C Secure wall bottom plates to floor with 3 nails Fig C 1 1 2 3 8 cm Nails 6 15 2 cm 3 7 6 cm Screw Fig D 6 15 2 cm Secure wall with 1 2 screw through gable wall panel into 10 wall bottom and top plates Fig B Fig A Secure wall to bottom plate first ENSURE PANEL CORNERS ARE FLUSH 2 BEGIN 1 Remove temporary brace OO from installed 10 gable wall Place...

Page 34: ... eave wall studs with 1 1 2 nails spaced 6 apart ENSURE PANEL CORNERS ARE FLUSH Your walls are now installed FINISH 2 5 1 cm x10 1 1 2 3 8 cm x26 2 5 1 cm x4 PARTS REQUIRED Secure wall top plates with 3 screws at each corner at an angle Fig D 3 2 5 1 cm Screw Flush Flush Fig A Fig B 6 15 2 cm 2 5 1 cm Nails 1 1 2 3 8 cm Nails 6 15 2 cm 3 7 6 cm Screw Fig D 3 7 6 cm Nails Nail 2 nails first 2 5 1 c...

Page 35: ...is to the bottom OO BEGIN 1 1 2 5 cm 3 7 6 cm Screws Secure lower edge of panel to floor frame with 2 nails spaced 6 apart Angle nails into floor frame Fig A Secure wall bottom plates to floor with 3 nails Fig A 2 Your 10 gable wall 02 is now standing FINISH Install OO as a temporary brace Secure with 2 3 screws 6 15 2 cm D O O R D O O R Nail 2 nails first 2 5 1 cm Nails 3 7 6 cm Nails Fig A 2 5 1...

Page 36: ... apart Angle nails into floor frame Fig C Nail panel to 10 wall stud with 1 1 2 nails spaced 6 apart ENSURE PANEL CORNERS ARE FLUSH Your 1st eave wall 04 is now installed FINISH 2 5 1 cm x32 1 1 2 3 8 cm x13 2 5 1 cm x2 PARTS REQUIRED 2 5 1 cm Nails 1 1 2 3 8 cm Nails Flush 6 15 2 cm 6 15 2 cm 2 5 1 cm Screw Fig B 2 5 1 cm Screw Fig A Secure wall top plate with 1 3 screw at the corner at an angle ...

Page 37: ...s now installed FINISH 3 7 6 cm Nails Secure wall top plate with 1 3 screw at the corner at an angle as shown Fig D 5 3 Nail lower edge of wall panels to floor frame with 2 nails spaced 6 apart Angle nails into floor frame Fig C Secure wall bottom plates to floor with 3 nails Fig C 6 15 2 cm 3 7 6 cm Screw Fig D Secure wall with 1 2 screw through gable wall panel into 10 wall bottom and top plates...

Page 38: ...rt Angle nails into floor frame Fig C Nail panels to eave wall studs with 1 1 2 nails spaced 6 apart ENSURE PANEL CORNERS ARE FLUSH Your walls are now installed FINISH Cut out and remove bottom plate at door opening 2 5 1 cm x10 1 1 2 3 8 cm x26 2 5 1 cm x4 PARTS REQUIRED Secure wall top plates with 3 screws at each corner at an angle Fig D 3 2 5 1 cm Screw Flush Flush Fig A Fig B 6 15 2 cm 2 5 1 ...

Page 39: ...th 2 3 nails as shown Your over door doubler is now installed FINISH Continue securing OY with 3 3 nailss spaced evenly NOTE Set 3 middle nails at an angle Fig A Do not allow nails to protrude below top plate OY 3 7 6 cm Nails 3 7 6 cm Nail PARTS REQUIRED Fig A 3 7 6 cm Nails set in at an angle x1 2 x 3 x 72 5 1 x 7 6 x 182 9 cm OY Flush to panel Mark Center ...

Page 40: ...ils following the pattern shown FIg A Build 2 rafter assemblies with 1 gusset Fig B Depending on your shed size build 4 or 6 rafter assemblies with 2 gussets Fig C BEGIN 1 2 3 FINISH Your rafters are now assembled Remove RL and screws from floor 2 5 1 cm PARTS REQUIRED x168 x120 x16 x12 x14 x10 6 x 24 15 2 x 60 9 cm 10x14 10x10 Flip over rafter assembly and fasten second gusset to other side with ...

Page 41: ...SET facing inward 3 7 6 cm x6 10x14 x2 x32 x4 10x10 x2 x24 Flush to outside of panel Flush to outside of panel Flush to outside of panel Flush to outside of panel Rafter with ONE GUSSET facing inward Rafter with ONE GUSSET facing inward 10 x 10 10 x 14 Two Gusset Preassembled One Gusset Preassembled Flush to inside of panel 3 7 6 cm Screws angled into top plate Fig A Flush to inside of panel 3 7 6...

Page 42: ...s on GPP flush to installed panel and secure with 1 1 2 nails spaced 6 apart along edge Repeat for right panel 1 BEGIN 1 1 2 3 8cm x24 Install gable panels with the primed side facing up Mark Your back gable unit is now assembled FINISH 6 15 2 cm 1 3 4 4 4 cm 1 3 4 4 4 cm 1 1 2 3 8 cm GPP 1 1 2 3 8 cm Nails 6 15 2 cm 1 1 2 3 8 cm Nails x1 x1 2 x 4 x 43 3 16 5 1 x 10 2 x 109 7 cm x2 GPP x1 23 7 8 x...

Page 43: ...hown Snip off the protruding nails You are finished with the temporary supports Set them aside 1 BEGIN 1 BEGIN Your gable panel with hay loft trim is now assembled FINISH 2 5 1 cm Finishing Nails 3 4 19 mm Screws PARTS REQUIRED FRONT GABLE HAY LOFT TRIM 3 4 19 mm x20 2 5 1 cm x14 Center Temporary Support Flush all connections KX x4 19 32 x 2 1 2 X 21 3 4 1 6 x 7 6 x 55 2 cm x2 19 32 x 2 1 2 x 12 7...

Page 44: ...ace end panels on FIB flush to installed panel and secure with 1 1 2 nails spaced 6 apart along edge Repeat step 2 for right panel 1 BEGIN 1 1 2 3 8cm x24 Install gable panels with the primed side facing up Mark Your front gable unit is now assembled FINISH 6 15 2 cm 1 1 2 3 8 cm Nails 6 15 2 cm 1 3 4 4 4 cm 1 3 4 4 4 cm 1 1 2 3 8 cm 1 1 2 3 8 cm Nails x1 x1 x1 2 x 4 x 41 11 16 5 1 x 10 2 x 105 9 ...

Page 45: ... Mark Continue securing panels to top plate and rafter with 2 nails spaced 6 apart Working inside secure gable unit with 2 3 screws angled into each GPP at an angle Fig A Measure 1 1 2 3 8 cm down from top plate and mark at each side as shown Set back gable unit centered on back wall top plate Fasten with 1 2 nail on each side BE SURE GABLE IS CENTERED ON WALL BEFORE NAILING FINISH Pre assembled F...

Page 46: ...rk Continue securing panels to wall doubler top plate and rafter with 2 nails spaced 6 apart Working inside secure gable unit with 2 3 screws angled into each FIB at an angle Fig A Measure 3 7 6 cm down from top plate doubler and mark at each side as shown Set front gable unit centered on front wall doubler Fasten with 1 2 nail on each side BE SURE GABLE IS CENTERED ON WALL BEFORE NAILING FINISH P...

Page 47: ...ide until the top corner is flush to the peak Fig B and there is a 1 2 measurement on the gable end rafter Fig C Secure panel with 2 2 nails in the corners 2 Place 1 48 x 96 panel on rafters with a 3 4 measurement on the rafter Fig A and the panel flush at the peak Fig B Secure panel with 2 2 nails in the corners 3 4 1 9 cm Fig A Gauge Block BEGIN 1 Flush at peak Fig B Two Nails Flush at peak Fig ...

Page 48: ...rafters Secure panels with 1 2 nail into each rafter 7 16 x 23 7 8 x 48 1 1 x 60 6 x 121 9 cm x1 Install 1 23 7 8 x 48 roof panel flush to the installed panel and flush at peak Fig B Secure panel with 1 2 nail in each corner Move the gable end rafter edge until it is 1 2 from the 23 7 8 x 48 roof panel Fig C Finish securing panel with 1 2 nail in each corner 3 4 2 5 1 cm Nails Fig D NOTE Measureme...

Page 49: ...x2 23 7 8 x 23 7 8 60 6 x 60 6 cm x2 15 7 8 x 23 7 8 40 3 x 60 6 cm x2 15 7 8 x 96 40 3 cm x 243 8 cm 2 5 1 cm Nails 23 7 8 x 96 15 7 8 x 96 23 7 8 x 23 7 8 15 7 8 x 23 7 8 3 4 1 9 cm Fig A Gauge Block Flush Flush Flush Flush Flush Flush Fig E Flush Next install 23 7 8 x 48 and 23 7 8 x 96 roof panels with a 3 4 measurement on the rafter Fig A and flush to the installed panels Fig E Secure panels ...

Page 50: ...lled Repeat all steps to install roof panels on the opposite side FINISH Secure all roof panels with 2 nails spaced 6 apart and 12 apart inside of the upper panels 8 PARTS REQUIRED 10 x 10 ROOF PANELS 2 5 1 cm 6 15 2 cm 12 30 5 cm x160 ...

Page 51: ...he panel side to side until the top corner is flush to the peak Fig B Move gable end rafter edge until it is 1 2 from the 48 x 47 7 8 roof panel Fig C Secure panel with 1 2 nail in each corner 2 Place the 48 x 96 panel on rafters with a 3 4 measurement on the rafter Fig A and the panel flush at the peak Fig B Secure panel with 1 2 nail in each corner 48 x 96 Flush at peak Fig B BEGIN 1 3 4 1 9 cm ...

Page 52: ...h at the peak Fig B Secure panel with 1 2 nail in each corner Move gable end rafter edge until it is 1 2 from the 23 7 8 x 48 roof panel Fig C Finish securing panel with 1 2 nail in each corner 3 4 5 PARTS REQUIRED 10 x 14 ROOF PANELS x16 2 5 1 cm Fig D Maintain spacing between the center of the rafters at the lower edge of the panels Fig D Secure panels with 1 2 nail into each rafter as shown Mov...

Page 53: ...ll 23 7 8 x 48 and 23 7 8 x 23 7 8 upper roof panels flush to the installed panels Fig E Secure panels with 1 2 nail in each corner Install 15 7 8 x 96 panel with a 3 4 measurement on the rafter Fig A and flush to the installed panels Secure panels with 1 2 nail in each corner Install 15 7 8 x 48 and 15 7 8 x 24 roof panels flush to the installed panels Secure panels with 1 2 nail in each corner 6...

Page 54: ... installed Repeat all steps to install roof panels on the opposite side FINISH Secure all roof panels with 2 nails spaced 6 apart and 12 apart inside panels 10 PARTS REQUIRED 10 x 14 ROOF PANELS 2 5 1 cm 6 15 2 cm 12 30 5 cm x240 ...

Page 55: ...ed trim Secure trim with 2 finish nails evenly spaced as shown BEGIN 1 2 2 5 1 cm Finishing Nails 2 5 1 cm Finishing Nails AHC AHC AHC AHC BBL BBL BBR BBR Flush to roof panel Flush to roof panel Flush to roof panel Flush to roof panel Repeat steps to install trim to the back gable FINISH Flush Flush Flush Flush Flush at peak Flush at peak 19 32 x 3 1 2 x 40 3 16 1 5 x 8 9 x 102 1 cm AHC x4 19 32 x...

Page 56: ...le panel Fig A and flush to eave wall panel Fig B Secure with 2 finishing nails spaced evenly Install eave side 71 3 16 corner trim flush to eave soffit and flush along seam of installed corner trim Fig C Secure with 2 finishing nails spaced evenly 2 BEGIN 1 Flush to eave panel Fig A Flush to gable panel Flush to roof panel Fig C Seam is flush Caulk seam before painting trim PARTS REQUIRED 3 8 x 1...

Page 57: ...and then on every other rafter as shown FINISH Your collar tie s are now installed 3 7 6 cm 1 BEGIN 1st 1st 3rd 3rd 5th 1 x 3 x 96 2 5 x 7 6 x 243 9 cm BE HINT For best appearance install collar ties on back side of rafter Fig A PARTS REQUIRED COLLAR TIE INSTALLATION x18 x12 x3 x2 10x10 10x14 Flush to roof panel GABLE WALL GABLE WALL 3 7 6 cm Nails 10 x 10 10 x 14 ...

Page 58: ... 4 3 2 cm Screws PARTS REQUIRED x1 x1 Left Door Right Door DOORS 3 7 6 cm x4 1 x 3 x 5 2 5 x 7 6 x 12 7 cm x1 GAA x2 1 1 4 3 2 cm Place doors on flat surface 3 8 offset is to top Look for red right and green left on hinge board Attach temporary supports OO and GAA as shown BEGIN 1 OO x1 69 175 3 cm Door Stiffener ...

Page 59: ...O PARTS REQUIRED DOORS 2 3 Screw hinge boards into wall supports with 10 3 screws as shown Make sure screws go into framing 4 Install OO flush under panels Secure to floor frame with 2 3 screws Fig A Mark center of door opening IMPORTANT NOTE You may need to lower and level OO so that doors will fit under gable panels OO x1 69 175 3 cm Door Stiffener 5 3 7 6 cm Screws in door stud 2 3 7 6 cm Screw...

Page 60: ... ZJ 19 32 x 2 1 2 x 72 1 5 x 7 6 x 182 9 cm 3 4 1 9 cm x72 2 5 1 cm Finishing Nails 2 5 1 cm x7 You have 3 options for door trim see Fig C Fig B Trim Option 2 Customize your door trim use 1 of 3 options Assembly for Option 1 is shown in Fig A If you choose Option 2 reverse CYL and CYR If you choose Option 3 make no modifications to doors Add or subtract more screws as needed Trim Option 3 Fig C Fi...

Page 61: ...g B OO IT IS IMPORTANT TO HOLD THESE DIMENSIONS 12 30 5 cm Approx BEGIN Center OO vertically on the left door in the doorway Fig A overlapping 1 2 5 cm along the edge of door Fig B Secure with 7 2 screws through outside trim into OO 1 Center OO vertically on the right door in the door opening offset 1 2 5 cm from the edge of door Fig B Secure with 7 2 screws through outside trim into OO 2 2 5 1 cm...

Page 62: ...om floor Bolt is open when loop is connecting base Fig B Mark and pre drill holes for screws Install bolt with screws supplied Drill 5 16 7 9 mm hole deep enough for bolt to slide into 5 16 7 9 mm drill for bolt 1 2 5 cm deep 5 16 7 9 mm drill for bolt 1 2 5 cm deep 1 2 12 7 mm OPEN POSITION Spring is loose OVER DOOR FRAME FLOOR Loop contacts base Loop contacts base OPEN POSITION Spring is loose 3...

Page 63: ... handle in hole and secure with 1 1 4 screws FINISH x1 x2 1 1 2 3 8 cm Re drill hole with 1 2 drill Keep drilled hole square to trim to avoid breaking edge of door stiffener Measure and mark location of hole on outside of right door as shown Fig A Pre drill hole with 1 4 drill PARTS REQUIRED DOOR HARDWARE RIGHT DOOR 1 3 4 4 4 cm TOP VIEW 1 4 Pre drill and 1 2 Drill through Fig A 35 3 4 90 cm 1 3 4...

Page 64: ...r two vents in side walls as shown 1 at top and 1 at bottom Cut out marked openings Caulk behind vent flanges Secure with 1 2 screws 1 Your vents are now installed FINISH 16 x 8 x2 1 2 13 mm x12 6 15 2 cm 3 5 7 6 12 7 cm 14 35 6 cm 1 2 Screws 1 3 cm 1 2 Screws 1 3 cm 14 35 6 cm 6 15 2 cm 5 12 7 cm 7 8 17 8 20 3 cm Caulk Caulk ...

Page 65: ...nufacturer PAINT CAULK NOT INCLUDED ROOF FELT NOT INCLUDED Install felt flush to all roof edges overlapping 3 Use minimal amount of roofing nails to hold in place OK to overlap at ridge 3 OVERLAP Flush Flush DRIP EDGE NOT INCLUDED NOTE 10 x 10 Model Shown Snip bottom side of drip edge and bend over to other side of roof Follow directions provided by manufacturer No drip edge on sides Roof Felt Dri...

Page 66: ...cross with lower edge of roof deck NOTE If you have installed drip edge install shingles flush to drip edge BEGIN 1 TABS UP Shingle overlaps roof decking 1 2 5 cm overhang past roof deck 1 2 5 cm overhang or flush with drip edge 4 Nails BACK OF SHED FRONT OF SHED NEVER DRIVE FASTENERS INTO OR ABOVE SEALING STRIPS Familiarize yourself with a 3 Tab Shingle SHINGLE NAIL PATTERN 1 2 5 cm NAILS Sealing...

Page 67: ...Roof Deck 1 2 5 cm Flush with starter row Flush with starter row Continue installing rows of shingles by staggering at front 4 Install second row of shingles flush at top of first row s rain slots Ensure 1 overhang or flush to drip edge at front stagger each row 3 Bend in roof 1 2 5 cm 1 2 5 cm BACK OF SHED FRONT OF SHED FRONT OF SHED Flush with rain slots Flush with rain slots Notch Notch ...

Page 68: ... 5 to rain slot you must install another row of shingles 5 12 7 cm or less 5 12 7 cm MAX Top of rain slot Cut Off You have finished shingling your roof Proceed to capping the ridge FINISH Repeat steps 1 7 to shingle the opposite side of your roof Trim shingles at ridge Once both sides are shingled you need to trim ends Strike a chalk line 1 from edge Using your shingle hooked blade carefully cut s...

Page 69: ...o shingles at front as shown Install second ridge cap 5 back as shown 2 3 BEGIN 1 2 5 1 cm 2 5 1 cm 2 5 1 cm 2 5 1 cm 2 5 1 cm 2 5 1 cm Top of slot Weather Seal Flush 1 Nail per side through weather seal 1 Nail per side through weather seal 5 12 7 cm FRONT OF SHED Flush Note You will need about 27 29 cut pieces for 10 x 10 model You will need about 36 38 cut pieces for 10 x 14 model 10x10 27 to 29...

Page 70: ...4 between the shingle color and edge of shingles When you have 4 minimum of shingle color cut one piece to cap your roof Install flush to shingles 4 5 6 7 2 Nails per side You have finished your ridge cap FINISH Cut at top of rain slot Flush to shingles Trim cap off flush to shingles Cap 4 10 2 cm ...

Page 71: ...000 2 JGA Horizontal Vertical Window Trim 19 32 TST 2 1 2 X 21 3 4 UT21120208000 4 KX Over Door Trim 19 32 TST 2 1 2 X 72 TRIM UT72000208000 1 ZJ Right Upper Gable Trim 19 32 TST 3 1 2 X 48 3 8 19 5 24 L L RGT GABLE TRIM UT48062024100 2 BBR Left Upper Gable Trim 19 32 TST 3 1 2 X 48 3 8 19 5 24 L L LFT GABLE TRIM UT48062024200 2 BBL Lower Gable Trim 19 32 TST 3 1 2 X 40 3 16 L L 24 UT40030308024 4...

Page 72: ...SB siding to include all exterior walls and all sides and all edges of doors Gazebos Pergolas To validate your warranty it is necessary to properly maintain your Backyard Storage Solutions LLC unit This includes treating all of the exposed cedar and pine surfaces on your gazebo or pergola structure with an exterior grade wood preservative an exterior oil based semi transparent stain an acrylic lat...

Reviews: