Hang the 

Primary and Slave Doors (B0014) and (B0015) 

as below. 

Use 1x 

25mm Screw (A0032) 

per

 

hinge first to align the doors. Once happy, finish the rest of the screws 

into the hinges. Test doors open and close correctly. 

Tip: 

Use coins or something similar as packing under the doors to help level them out. 

Fix the 

Barrel Bolts (A0014) 

on the slave door as below. Fix both to the door using 4x 

10mm Screws 

(A0028) 

in each. One at the top, one at the bottom. Make sure you mark and drill a hole in the gable and 

floor panel for the bolt to slot into when the door is closed.  

Mark a centre point onto the Primary Door and drill a hole. Then fix the 

Gate Latch (A0015) 

through as 

below. Fix the plates using 4x 

Black 25mm Screws (A0029) 

in each. 

Then attach the Latch holder onto the slave door using 2x 

Black 25mm Screws (A0029). 

Tip: 

Mark where the holes go first before drilling. 

10 

  

  GB-IE 

20

 

Black 25mm Screws 

(A0029)x10 

 

Primary Door 

(B0014)x01 

(Step 01) 

Slave Door 

(B0015)x01 

(Step 01) 

Gate Latch 

(A0015)x01 

25mm Screws 

(A0032)x30 

3+5mm  

10mm Screws 

(A0028)x08 

Barrel Bolt 

(A0014)x02 

10 

 

Summary of Contents for 7x5 Haddon 2022

Page 1: ...a Leney 23 11 2021 These instructions are for your safety Please read through them thoroughly before use PLEASE KEEP THIS LEAFLET FOR FUTURE REFERENCE 7x5 Haddon 2022 7x5 7 Houghton 2022 Mass 171 5 kg...

Page 2: ...j zyku prosimy o wys anie maila lub pisa na adres podany poni ej RUS TR Ba ka bir dilde talimatlar veya bir kopyas n bir kopyas i in bir e posta g nderebilir veya a a daki adrese yaz n z EN For a copy...

Page 3: ...mbly Only use child and animal safe wood preservative Do not use creosote Allow the wood preservative to fully dry before use Regularly check the building for wear and tear Getting Started GB IE EVERY...

Page 4: ...sealed annually NOTE Wood is a natural product and therefore the following are excluded from the warranty Colour change Warping Splitting Preparation of base We recommend that the base onto which your...

Page 5: ...The 6 golden rules of maintenance 1 Timber widely recycled 2 Metal fixings widely recycled 3 Glass widely recycled 4 Roofing felt not currently recycled packaging Building 1 Ensure your base is level...

Page 6: ...Stacked Parts List Description part No Qty 06...

Page 7: ...Fascia and Nail Bag Parts List Description part No Qty 07...

Page 8: ...In more detail GB IE 08...

Page 9: ...In more detail GB IE 09...

Page 10: ...ing Photographs It will be greatly appreciated if you could forward images of your completed building to sales shiregb co uk Description part No Qty 8mm A0029 x 10 Black 25mm Posi Drive Screw 10 A0024...

Page 11: ...e 4 You will need Hammer Spirit level Ladder 1mm 5mm drill bit Drill Tape measure Ruler Sand paper Gloves Saw Pencil Goggles A helper for some tasks Screwdriver Sharp knife Masking tape When you see t...

Page 12: ...lain 990 and 310 Panels FIT INSIDE THE PLAIN 990 AND 560 PANELS Primary Door B0014 x01 Panel Layout Fit the Storm Hinges 2 5 A0013 to the Primary and Slave Door B0014 and B0015 as above Position them...

Page 13: ...no less then 20mm from the edge Place the other Floor Panel A0003 onto the joiners and nail with 2x 40mm Nails as before Carefully put the floor onto your chosen base 02 13 Floor Panel A0001 x01 Floor...

Page 14: ...005 as below Place the 560 into the corner so that the cladding overlaps the floor Push the 990 panel up to it and fix with 3x 60mm Screws A0035 14 03 5 mm NOTE Some holes drilled for later use Plain...

Page 15: ...mm Screws A0035 using the pilot holes drilled in the other 990 panel Drill the other Plain Panel 560 A0005 as below Fix with 3x 60mm Screws A0035 using the pilot holes drilled 04 5 mm 15 Plain Panel 5...

Page 16: ...Plain Panels 990 A0004 as below Fix to your building with 3x 60mm Screws A0035 in each using the pilot holes drilled in the 560 panels 05 5mm DO NOT FIX WALLS TO FLOOR UNTIL ASKED Plain Panel 990 A000...

Page 17: ...he floor bearers Fix with 3x 60mm Screws A0035 in each Make sure the aperture measures 910mm top and bottom 06 5mm Window Panel A3038 x02 60mm Screws A0035 x06 910mm DO NOT FIX WALLS TO FLOOR UNTIL AS...

Page 18: ...Screws A0035 and the front gable with 2x 60mm Screws A0035 07 Gable A0007 x02 60mm Screws A0035 x06 5mm GB IE Place the Roof Bearers 34x34 A0008 onto your building into the slots in the gables Drill a...

Page 19: ...Nail with 6x 40mm Nails A0025 along each of the roof bearers and the sides making sure the nails go into the walls Attach the Roof Overhang 34x34 A07109 with 2x 40mm Nails A0025 in each as below 09 5...

Page 20: ...ne at the bottom Make sure you mark and drill a hole in the gable and floor panel for the bolt to slot into when the door is closed Mark a centre point onto the Primary Door and drill a hole Then fix...

Page 21: ...d true Fix the walls to the floor with 60mm Screws A0035 using the pilot holes drilled previously 11 GB IE Nail the Coverstrips 12x46x1720 A0016 to your building as below Fix with 4x 40mm Nails A0025...

Page 22: ...t the first two strips as below Make sure there is an even overhang front and back pull tight and secure with 8mm Felt Nails A0266 approximately 100mm apart Repeat with the top 13 22 Tidying the edge...

Page 23: ...using 2x 40mm Nails A0025 in each 14 GB IE Place the Window Casements B0013 into the window panel as below Fix the casement to the window panel using 1x 60mm Screw A0035 per side as below 15 5mm Wind...

Page 24: ...m Panel Pins A0024 in each in the Windows Fit the Glass 323x373 A0366 Beading 377 A0021 and Beading 327 A0074 within the doors using 3x 16mm Panel Pins A0024 in each 16 GB IE Glass 360x373 A2554 x04 B...