60

× 

15

× 

850

× 

110

× 

40

5

×

70

4

×

50

6

×

140

1,4X40

M8

×

70

Ø 3 

mm

Ø 4 mm

Ø 5 mm

Ø 8 mm

× 

65

4

×

40

1/24

ARBOGA II 40

PREPARE THE 

GROUND

, UNWRAP THE 

PACKAGE, 

LAY OUT THE 

COMPONENTS

, FIND THE 

TOOLS.

Summary of Contents for Arboga II 40

Page 1: ... 60 15 850 110 40 5 70 4 50 6 140 1 4X40 M8 70 Ø 3 mm Ø 4 mm Ø 5 mm Ø 8 mm 65 4 40 1 24 ARBOGA II 40 PREPARE THE GROUND UNWRAP THE PACKAGE LAY OUT THE COMPONENTS FIND THE TOOLS ...

Page 2: ...RE THAT THE FOUNDATION IS INSTALLED ON A LEVEL SURFACE CHECKING ALL DIRECTIONS INCLUDING CORNER TO CORNER 3 LAY OUT THE FOUNDATION BEAMS AND SQUARE IT BY MEASURING FROM CORNER TO CORNER IFB1 A C D B AB CD 0 IFB2 IFB3 IFB5 IFB4 ...

Page 3: ... 2 10 5 70 6 140 Ø 4 mm Ø 5 mm 3 24 ARBOGA II 40 ATTACH FOUNDATION BEAMS WITH SCREWS 4 6 140 5 70 ...

Page 4: ...4 24 ARBOGA II 40 LAY OUT THE BOTTOM LOGS SO THAT DOOR OPENING WILL BE 1441 MM WIDE 5 2 LG 1 1 LG 1 A BL 1 B BL 1 1441 mm ...

Page 5: ...12 5 70 6 140 Ø 4 mm Ø 5 mm 5 24 ARBOGA II 40 ATTACH LOGS TO THE FOUNDATION THE WALL LOGS WILL HANG OVER THE FOUNDATION BEAMS BY APPROXIMATELY 5MM THIS OVERHANG IS DESIGNED AS A RAIN DRIP 6 6 140 5 70 5mm ...

Page 6: ... 3 5 70 Ø 4 mm 6 6 140 Ø 5 mm 6 24 ARBOGA II 40 7 ATTACH THE NEXT ROW OF WALL LOGS INTO THE BOTTOM LOGS WITH SCREWS 6 140 5 70 A LG 1 B LG 2 ...

Page 7: ...7 24 ARBOGA II 40 9 AFTER PLACING 3 4 ROWS OF WALL LOGS TAP EACH WALL LOG IN PLACE USING A HAMMER AND THE HITBLOCK PROVIDED TO TIGHTEN THE LOGS HITBLOCK 1 LG 6 ...

Page 8: ...8 24 ARBOGA II 40 10 SLIDE THE DOOR IN ATTACH THE HANDLE CDD6R 3 LOGS IN PLACE ...

Page 9: ...9 24 ARBOGA II 40 22 DON T FORGET TO TIGHTEN THE LOGS AFTER EVERY 3 4 ROWS HITBLOCK 1 LG 3 1 LG 2 B LG 4 B LG 1 ...

Page 10: ...10 24 ARBOGA II 40 SLIDE THE WINDOWS IN ATTACH THE HANDLE 23 CDW2L CDW2R ...

Page 11: ...11 24 ARBOGA II 40 46 2 LG 2 B LG 6 16 LOGS AND 1 HALF LOG IN PLACE B LG 3 1 LG 5 1 LG 7 1 LG 4 ...

Page 12: ...A II 40 INSTALL CEILING TRIANGLE AND ATTACH WITH SCREWS INTO THE WALLS LEAVE 4CM CAP BETWEEN DOOR AND CEILING DETAIL ATTACH IT INTO WALLS AND INTO CEILING TRIANGLE USING SCREWS 47 CEILING DETAIL 40 120 CEILING TRIANGLE 5 70 4 50 ...

Page 13: ... 40 6 140 Ø 5 mm 13 24 ARBOGA II 40 52 ATTACH TOP LOGS INTO WALL LOGS WITH SCREWS B TL 2 2 TL 3 2 TL 1 2 TL 2 A TL 3 A TL 1 A TL 2 A TL 4 1 TL 3 1 TL 1 1 TL 2 B TL 1 B TL 3 B TL 4 ...

Page 14: ...14 24 ARBOGA II 40 53 CONNECT THE ROOF PURLINS RFR WITH RD BEFORE INSTALLING THEM ON TOP OF THE CORNERS RD RFR ...

Page 15: ... 4 6 140 Ø 5 mm 15 24 ARBOGA II 40 55 INSTALL THE ROOF PURLINS AND ATTACH THEM WITH SCREWS ...

Page 16: ... 16 5 70 Ø 4 mm 16 6 140 Ø 5 mm 16 24 ARBOGA II 40 58 INSTALL THE ROOF PURLINS RFB AND ATTACH THEM WITH SCREWS RFB2 RFB4 RFB1 RFB3 5 70 6 140 ...

Page 17: ... 408 4 50 17 24 ARBOGA II 40 62 PLACE THE FIRST ROOFBOARD FLUSH WITH THE END OF THE PURLINS AND ATTACH WITH SCREWS RB21 ...

Page 18: ...ROOF TOP 40 4 40 18 24 ARBOGA II 40 86 INSTALL THE ROOF TOP AND ATTACH IT WITH SCREWS ATTACH FASCIA TRIMS INTO ROOFPURLINS RF ...

Page 19: ... 288 4 50 19 24 ARBOGA II 40 87 SCREW THE FLOORBOARDS INTO FOUNDATION SAW THE LAST BOARD TO MAKE IT FIT FB ...

Page 20: ... 40 1 4x40 20 24 ARBOGA II 40 96 SAW THE BASEBOARDS AND ATTACH WITH NAILS AT EVERY 0 5 METERS BB ...

Page 21: ...4CM 20CM 15 M8 70 Ø 8 mm 21 24 ARBOGA II 40 DRILL THROUGH THE WALL HOLE MUST BE AT THE BOTTOM OF THE OVAL ATTACH WITH BOLT 97 WINDBOARD ...

Page 22: ...90º 90º 22 24 ARBOGA II 40 IF DOOR IS TILTED PUSH THE DOOR FRAME SO THAT ALL CORNERS ARE 90º 98 ...

Page 23: ...23 24 ARBOGA II 40 99 IF DOORS ARE IN DIFFERENT HEIGHTS OR THERE IS A GAP BETWEEN THEM ADJUST 3 SCREWS ON DOOR HINGES ...

Page 24: ...24 24 ARBOGA II 40 WHEN THE HOUSE IS ASSEMBLED YOU SHOULD COVER THE TIMBER WITH WOOD PROTECTIVE SEAL PAINT OR STAIN AS SOON AS POSSIBLE TO AVOID DETERIORATION TO THE WOOD 100 ...