Please be careful about a strong wind and the opening and shutting of the door at the sloping
place enough. A door is open suddenly and is closed, and a finger might be sandwiched.
Turn the main breaker on
the operation panel to OFF.
Turn the Throttle switch to IDLING.
Turn the Battery Isolator to ON position
Turn the Starter switch to PREHEAT.
When the pre-heating indicator changes
from lit up to off, immediately change
the switch to START and start the engine.
< Note >
Pre-heating time depends on the coolant temperature, and completes in approximately
3 to 10 sec.
Do not continuously operate the starter motor for 10 sec. or more.
If repeating starter switch operation, wait 30 sec. or more between re-starting.
Be aware that smoke might be generated when the engine is started.
After starting the engine, remove your hand from the starter switch.
Let engine idles for approximately for five minutes.
Turn the Throttle switch to RUN.
Adjust the voltage regulator dial to the specified voltage.
Turn the breaker to ON to start AC power delivery.
9-2. Procedures during Operation
(1) Checks after Startup
Make sure that all meters and indicators are in normal status. (Refer to section “
5. Equipment
”.)
Check that there is no abnormal vibration or noise.
Check that the exhaust gas color is normal. When operation is normal, the exhaust gas should be
colorless or slightly bluish.
< Note >
If abnormal, stop using this generator and request authorized distributor where the generator was
purchased to repair the generator.
(2) Adjustment during Operation
During load operation, check the voltmeter and finely adjust voltage using the voltage
regulator dial.
Bleeding air from the fuel system when the engine stops due to running out of fuel
This generator is equipped with an automatic air bleeding mechanism. Perform the
following procedures when the engine stops due to running out of fuel to easily bleed
the air from the system.
Add fuel to the generator.
Turn the starter switch to RUN. Air bleeding is completed approximately in 30 sec.
1
6
7
8
2
5
9
10
1
4
2
3
Throttle Switch
Starter
Switch
MainBreaker
Pre-Heating
Indicator
Battery isolator
Summary of Contents for DG20MK-P
Page 2: ......
Page 43: ...40 13 Generator Circuit Diagram...
Page 44: ...41 14 Engine Electrical Circuit Diagram...
Page 45: ...42...
Page 46: ...43...
Page 47: ...44...
Page 48: ...2016...