
29
INSTALLATION
Installation of the shifting cable
6
(A)
Turn the cable 60˚ counterclockwise and
attach it to the hook.
(A)
Hook
7
(A)
(H)
(G)
(y)
(C)
(z)
(B)
(D)
(F)
(E)
Set the inner cable in the pulley as
shown in the illustration and, while
holding the rubber cover, insert the
rubber bellows of the inner cable into
the slit in the cassette joint bracket
(y)
and securely set the outer casing holder
unit into the outer casing holder of the
cassette joint
(z)
. Be careful not to
damage the rubber bellows at this time.
(A)
Rubber bellows
(B)
Outer casing holder unit
(C)
Rubber cover
(D)
Inner cable
(E)
Pulley
(F)
Bracket
(G)
Slit
(H)
Outer casing holder
NOTICE
Check that the inner cable is correctly seated
inside the pulley guide.
Guide
Guide
8
(A)
(y)
(y)
(z)
Secure the cable to the frame with the
outer casing bands.
(y)
10 cm
(z)
15 cm
(A)
Outer casing bands
Summary of Contents for ALFINE Inter-11
Page 9: ...LIST OF TOOLS TO BE USED...
Page 11: ...INSTALLATION...
Page 31: ...ADJUSTMENT...
Page 35: ...MAINTENANCE...