
17
2
System
Startup and
Shutdown
C-arm
1
Set the C-arm to the center
position
Press and hold the Center Reset Switch until travel
is completed.
2
Move the C-arm to the park
position
Press and hold the C-arm Parking Switch until travel
is completed.
Digital Radiography System
3
Click
A confirmation message is displayed.
4
Confirm the message by clicking
X-ray Generator Console
5
Press
(OFF)
Make sure the OFF button is lit.
Circuit Breaker
6
Turn off the X-ray high voltage
generator circuit breaker
・
Wait at least 20 seconds after turning off the X-ray
high voltage generator, then turn off the circuit
breaker.
・
Do not turn off power for the FPD, digital
radiography system or X-ray tube.
Shutdown