![Shenzhen Hongdian Technologies NB007 User Manual Download Page 15](http://html1.mh-extra.com/html/shenzhen-hongdian-technologies/nb007/nb007_user-manual_1255950015.webp)
NB007 Analyzer User Manual
Initial Configuration
Doc V1.0
3
-11
Graph 3-4 Adding ping setting IP tag
2. Return to MAIN page, click “PING” button to conduct PING test
D-TEST
1. Click “
” to enter into Setting tag; revise Delay Test time; default is 10s, which means the testing will be
lauched after 10s, as is shown in graph 3-5.
Graph 3-5 Setting tag and launch D-test
2. Return to MAIN page, click “D-TEST” button to conduct delay test.
Summary of Contents for NB007
Page 1: ...NB007 Analyzer User Manual...
Page 22: ...Connecting Things...