![Shenbao SBR-26.0H-B-S Installation And Instruction Manual Download Page 16](http://html1.mh-extra.com/html/shenbao/sbr-26-0h-b-s/sbr-26-0h-b-s_installation-and-instruction-manual_1255607016.webp)
Space Humidity operating period
110
100
90
80
70
60
50
Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun
S
p
a
c
e
H
u
m
id
it
y
%
The position of installing unit
Space Temperature operating period
40
35
30
25
20
15
10
Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun
S
p
a
c
e
T
e
m
p
e
ra
tu
re
(
℃
)
Maxlmum Minlmum
Maxlmum Minlmum
13
SWIMMING POOL HEAT PUMP
Heat
pump
Outlet
Inlet
Inlet
Top 2000mm Above
1000mm Above
1000mm Above
1000mm above the top
Above 1000mm
Above 1000mm
Above 1000mm
Air inlet
Air inlet
Air inlet