
16 |
P a g e
INSTALLATION
L
IFTING AND
H
ANDLING
The unit is heavy. Use appropriate lifting devices sufficiently rated for these loads. Follow these guidelines
when lifting the unit.
•
Lift the unit only from its bottom surface.
•
Doors, handles, and knobs are not adequate for lifting or stabilization.
•
Restrain the unit completely while lifting or transporting so it cannot tip.
•
Remove all moving parts, such as shelves and trays, and lock the door in the closed position
during transfers to prevent shifting and damage.
R
EMOVING FROM THE
P
ALLET
The unit comes secured to a shipping pallet with ½” hex bolts inserted through the 4 leveling feet
holes on the bottom of the incubator. Use a socket wrench to remove the bolts and release the unit
from the pallet.
L
EVELING
Install the 4 leveling feet in the 4 corner holes on the bottom of the unit. The unit must be level and
stable for safe operation.
Note:
To prevent damage when moving the unit, turn all 4 leveling feet so that the leg of each foot
sits inside the unit.
0.5 inch (13 mm)