
9
|
P a g e
INSTALLATION
I
NSTALLATION
P
ROCEDURE
C
HECKLIST
Carry out the procedures and steps listed below to install the incubator in a new workspace location
and prepare it for use. All procedures are found in the Installation section of this manual.
Pre-Installation
Check that the required ambient condition for the unit are met, page 10
Check that the spacing clearance requirements are met, page 10
•
Unit dimensions may be found on page 33
Check for performance-disrupting heat and cold sources in the environment, page 10
Check that a suitable electrical outlet and power supply is present, page 11
Install the Incubator in a suitable workspace location
Review the lifting and handling instructions, page 12
Make sure the incubator is level, page 12
Install the incubator in its workspace location, page 12
Set up the Incubator for use
Clean and disinfect the unit and shelving (recommended), page 12
Install the shelving, page 13
Verify the port cover has been installed on the access port, page 13
Summary of Contents for SMI11
Page 1: ...SMI INCUBATORS 100 120 Voltage Installation Operation Manual SMI2 SMI6 SMI7 SMI11 SMI12...
Page 2: ...2 P a g e Pictured on cover SMI6 SMI2 SMI7 SMI11 SMI12 2 Stacked SMI6s...
Page 14: ...14 P a g e INSTALLATION...
Page 16: ...16 P a g e GRAPHIC SYMBOLS...
Page 18: ...18 P a g e CONTROL PANEL OVERVIEW...
Page 32: ...32 P a g e USER MAINTENANCE...