(3) Mount the multi bypass feeder unit onto the
main copier unit.
1
Slide the positioning pins which project from the multi bypass
feeder unit in to the grooves in the main copier unit, then push the
multi bypass feeder unit into place to in stall it.
At this time, to be sure that the multi bypass feeder unit is securely
installed, push down once more on the fourcorners of the unit. (If it
has not been securely installed, "CH" may appear in the COPIES
MADE display when the power is turned on.)
2
Close the upper unit of the main copier unit.
Multi bypass feeder unit
Rock claw (latch)
Positioning pins
Rock claw
(latch)
Positioning pins
Multi bypass
feeder unit
4 – 7