13
1. Remove the side plate L-R in accordance with “REMOVE OF SIDE PLATE L-R”.
2. Cut the charge tube and let compressor’s coolant out off the compressor about 1 minute.
3. Blow gas 2 joints, and remove the filter driers from the condenser ass’y and the capillary tube.
4. Now the filter driers is free.
REMOVE OF FILTER DRIERS
Condenser ass’y
Capillary tube
Filter driers
Capillary tube
Joint
Joint
Condenser ass’y
Charge tube
Compressor
Fig. 14
1. Remove the panel B-A and faucet ass’y in accordance with “REMOVE OF PANEL B-A” AND FAUCET ASS’Y”.
2. Cut the charge tube and let compressor’s coolant out off the compressor about 1 minute.
3. Disconnect 2 lead wires terminal of the compressor.
4. Remove the insulating seal cork tape and push up the cooling coil insulation tube.
5. Blow gas joint the cooling coil and joint the condenser ass’y to the compressor.
6. Remove 4 screws holding the compressor to the stand.
7. Now the compressor is free.
REMOVE OF COMPRESSOR
Cooling coil
Cooling coil
insulation tube
Stand
Screw
Condenser ass’y
Joint
Joint
Compressor
Condenser ass’y
Insulating seal
cork tape
Fig. 15
Summary of Contents for SB-29
Page 4: ...4 WIRING DIAGRAM CIRCUIT DIAGRAM ...
Page 19: ...19 ...