![Sharp MX-M623N Installation Manual Download Page 91](http://html.mh-extra.com/html/sharp/mx-m623n/mx-m623n_installation-manual_365792091.webp)
MX-M753N MX-SMX3 18 – 3
3)
Push the control PWB unit into the main unit.
4)
Secure the unit with the four screws.
•
If the fax box unit is installed, carry out step 5).
5)
Fit the interface cable into the right cabinet upper.
6)
Attach the right cabinet upper to the main unit.
7)
Secure the right cabinet upper with the three screws.
•
Reconnect the cables that have been removed in step B to
the original positions of the control PWB unit.
E. Turn on the main power switch of the main
unit.
1)
Insert the power plug of the main unit to the outlet.
2)
Turn on the main power switch.
3)
Turn on the power switch located on the operation panel.
ON