2-3-1
H9941MA
Explanation of alignment for the tape to correctly run
starts on the next page. Refer to the information below on
this page if a tape gets stuck, for example, in the
mechanism due to some electrical trouble of the unit.
Service Information
A. Method for Manual Tape Loading/Unloading
To load a cassette tape manually:
1. Disconnect the AC plug.
2. Remove the Top Case and Front Assembly.
3. Insert a cassette tape. Though the tape will not be
automatically loaded, make sure that the cassette
tape is all the way in at the inlet of the Cassette Holder.
To confirm this, lightly push the cassette tape further
in and see if the tape comes back out, by a spring
motion, just as much as you have pushed in.
4. Turn the LDG Belt in the appropriate direction shown
in Fig. M1 for a minute or two to complete this task.
To unload a cassette tape manually:
1. Disconnect the AC plug.
2. Remove the Top Case and Front Assembly.
3. Make sure that the Moving guide preparations are in
the Eject Position.
4. Turn the LDG Belt in the appropriate direction shown
in Fig. M1 until the Moving guide preparations come
to the Eject Position. Stop turning when the prepara-
tions begin clicking or can not be moved further.
However, the tape will be left wound around the
cylinder.
5. Turn the LDG Belt in the appropriate direction con-
tinuously, and the cassette tape will be ejected. Allow
a minute or two to complete this task.
MECHANICAL ALIGNMENT PROCEDURES
B. Method to place the Cassette Holder in the tape-
loaded position without a cassette tape
1. Disconnect the AC Plug.
2. Remove the Top Case and Front Assembly.
3. Turn the LDG Belt in the appropriate direction shown
in Fig. M1. Release the locking tabs shown in Fig. M1
and continue turning the LDG Belt until the Cassette
Holder comes to the tape-loaded position. Allow a
minute or two to complete this task.
Moving guide T preparation
(Eject Position)
LDG Belt
Push the locking tab gently to unlock
when loading without a cassette.
Side View
Moving guide S preparation
(Eject Position)
Push the tape
to load it.
UNLOAD
/EJECT
LOAD
Fig. M1
Top View
Fig. M2
Bottom View
Cam Gear
LDG Belt (B)
UNLOAD
/EJECT
Summary of Contents for DV-NC200SB
Page 12: ...1 6 1 H9941IB OPERATING CONTROLS AND FUNCTIONS DV NC200S S ...
Page 13: ...1 6 2 H9941IB ...
Page 14: ...1 6 3 H9941IB ...
Page 15: ...1 6 4 H9941IB ...
Page 16: ...1 6 5 H9941IB DV NC200 RU ...
Page 17: ...1 6 6 H9941IB a ...
Page 18: ...1 6 7 H9941IB ...
Page 19: ...1 6 8 H9941IB ...
Page 20: ...1 6 9 H9941IB DV NC200S B ...
Page 21: ...1 6 10 H9941IB ...
Page 22: ...1 6 11 H9941IB ...
Page 23: ...1 6 12 H9941IB ...
Page 60: ...1 14 3 H9941SCM1 Main 1 9 Schematic Diagram VCR Section ...
Page 62: ...1 14 5 H9941SCM3 Main 3 9 Schematic Diagram VCR Section ...
Page 63: ...1 14 6 H9941SCM4 Main 4 9 Jack B Schematic Diagram VCR Section ...
Page 64: ...1 14 7 H9941SCM5 Main 5 9 Schematic Diagram VCR Section ...
Page 65: ...1 14 8 H9941SCM6 Main 6 9 Schematic Diagram VCR Section ...
Page 66: ...1 14 9 H9941SCM7 Main 7 9 DVD Open Close Schematic Diagram VCR Section ...
Page 67: ...1 14 10 H9941SCM8 Main 8 9 Schematic Diagram VCR Section ...
Page 68: ...1 14 11 Main 9 9 Schematic Diagram VCR Section H9941SCM9 ...
Page 70: ...1 14 13 H9941SCJ Jack A Schematic Diagram VCR Section ...
Page 71: ...1 14 14 H9941SCAFV AFV Schematic Diagram VCR Section ...
Page 73: ...1 14 16 H9941SCD2 DVD Main 2 3 Schematic Diagram DVD Section ...
Page 80: ...1 14 23 DVD Main CBA Top View DVD Section BE6100G04012 ...
Page 81: ...1 14 24 DVD Main CBA Bottom View DVD Section BE6100G04012 ...