19
R-1405
R-1406
When testing is completed,
1) Disconnect the power supply cord.
2) Open the door and block it open.
3) To discharge high voltage capacitor, wait for 60 seconds.
4) Reconnect all leads removed from components during testing.
5) Re-install the hood intake duct R.
6) Re-install the outer case (cabinet).
7) Reconnect the power supply cord after the outer case is installed.
8) Run the oven and check all functions.
TEST PROCEDURES
PROCEDURE
LETTER
COMPONENT TEST
G11
G12
G 9
G 8
KEY UNIT
COOK
REHEAT
DEFROST
POWER
LEVEL
TIMER
CLOCK
POPCORN
LIGHT
FAN
1
2
4
5
3
8
6
9
0
7
G 7
G 6
G 5
G 4
G 3
G 2
G 1
G10
STOP
CLEAR
START
MINUTE
PLUS
N
RELAY TEST
1. Disconnect the power supply cord.
2. Open the door and block it open.
3. To discharge high voltage capacitor, wait for 60 seconds.
4. Remove the control panel assembly.
5. If the display fails to clear when the STOP/CLEAR pad is depressed, first verify the flat ribbon cable
is making good contact, verify that the door sensing switch (stop switch) operates properly; that is the
contacts are closed when the door is closed and open when the door is open. If the door sensing switch
(stop switch) is good, disconnect the flat ribbon cable that connects the key unit to the control unit and
make sure the door sensing switch is closed (either close the door or short the door sensing switch
connecter). Use the Key unit matrix indicated on the control panel schematic and place a jumper wire
between the pins that correspond to the STOP/CLEAR pad making momentary contact. If the control
unit responds by clearing with a beep the key unit is faulty and must be replaced. If the control unit does
not respond, it is faulty and must be replaced. If a specific pad does not respond, the above method
may be used (after clearing the control unit) to determine if the control unit or key pad is at fault.
6. Reconnect all leads removed from components during testing.
7. Re-install the control panel assembly.
8. Reconnect the power supply cord.
9. Run the oven and check all functions.
M
KEY UNIT TEST
1. Disconnect the power supply cord, and then remove outer case. Refer to procedure of " HOOD
EXHAUST LOUVER REMOVAL ", " REMOVAL OF OVEN FROM WALL " and " OUTER CASE
REMOVAL ".
2. Open the door and block it open.
3. To discharge high voltage capacitor, wait for 60 seconds.
4. Remove the hood intake duct R.
5. Disconnect the leads to the primary of the power transformer.
6. Ensure that these leads remain isolated from other components and oven chassis by using insulation
tape.
Summary of Contents for Carousel R-1405, Carousel R-1406
Page 45: ...43 R 1405 R 1406 NOTES ...
Page 46: ...44 R 1405 R 1406 NOTES ...
Page 47: ...45 R 1405 R 1406 NOTES ...