E-26
5~8mm
Installation of panel
GX-X24JR/GX-X36JR:AZ-24J
Fit the swing flap motor position of the panel to the piping position of the indoor unit.
1. Hang the latch, which is located on the opposite side of the swing flap motor on the panel, to the
hook of the indoor unit. (2 Positions)
2. Hang the remaining 2 latches to the hooks on the sides of the indoor unit. (Be careful not to get
the swing motor lead wire caught in the sealing material.)
3. Screw all 4 hexagon head screws located right beneath the latches in approximately 5mm. (The
panel will rise)
4. Adjust the panel by turning it to the arrowed direction in figure so that the ceiling opening is
completely covered.
5. Tighten the screws until the thickness of the sealing material between the panel and the indoor
unit is reduced to 5~8mm.
GX-X18JR:AZ-18J
. Unscrew the 2 screws.
2. Slide the 2 stoppers and remove the front grill.
3. Attach the panel on the indoor unit with the 4 hexagon bolts securely.
4. Replace the front grill and tighten the 2 screws removed in step .
5~8mm
Hook
Latch
Piping position
Swing flap moter
Indoor unit
Ceiling
Air outlet
Panel
Sealing material
INSTALLATION INSTRUCTIONS
GREE_cassette_eng.indd 26
08.10.28 11:42:46 AM