
2-56
CHAPTER 2 FINISHER UNIT BASIC OPERATION
III. POWER SUPPLY SYSTEM
1.
Outline
The finisher controller PCB is supplied with 24 VDC power when the host machine is turned
on. Power is also supplied from the finisher controller PCB to the saddle stitch controller PCB. In
addition, power is also supplied to the punch driver PCB when the optional puncher unit is mounted.
Some of the 24 VDC power used to drive motors is cut off when the door switch (MS1) is open.
The power to the saddle stitch controller PCB, however, will not be cut off.
Figure 2-301 is a block diagram showing the power supply system.
Power source
Figure 2-301
2.
Protection Functions
The 24 VDC power line used to drive motors and solenoids is equipped with a circuit breaker
(CB1) for protection against overcurrent. The 24 V line used to drive the first feed motor (M1),
alignment motor (M3), and stapler shift motor (M4) are equipped with a fuse, which is designed to
blow when an overcurrent occurs.
F15/F16
F15/F16
Summary of Contents for AR-F15
Page 8: ......
Page 36: ......
Page 77: ...2 41 CHAPTER 2 FINISHER UNIT BASIC OPERATION Height sensor PS1 Paper Figure 2 240 ...
Page 94: ......
Page 110: ...3 16 CHAPTER 3 SADDLE STITCH UNIT BASIC OPERATION Figure 3 302 ...
Page 124: ...3 30 CHAPTER 3 SADDLE STITCH UNIT BASIC OPERATION Cam Mount Figure 3 404 ...
Page 138: ...3 44 CHAPTER 3 SADDLE STITCH UNIT BASIC OPERATION ...
Page 140: ......
Page 156: ......
Page 202: ......
Page 214: ......
Page 223: ...7 9 CHAPTER 7 TROUBLESHOOTING II ARRANGEMENT OF ELECTRICAL PARTS A Finisher Unit ...
Page 260: ...7 46 CHAPTER 7 TROUBLESHOOTING ...
Page 262: ......
Page 273: ...A 11 APPENDIX Q500 FF3 4071 SADDLE RELAY BUNDLE WIRE ...
Page 276: ...Memo ...
Page 277: ...Memo ...