SharkRack Enclosure Installation Guide
ID-00210-000
REV D, ECO2773
Page 36 of 46
Chapter 5 Final Assembly
Check for Functionality
•
Have a qualified electrician verify the power sources for your specified power
requirements.
•
Check that there is no obstruction to any device that needs to be accessed for
maintenance.
•
Check that there is easy access to the power strips
•
Check that all fasteners are tight.
Typical torque values are:
o
10-32
30 inch-lbs.
o
M5
24
inch-lbs.
o
M6
40
inch-lbs.
•
Re-install the doors (See “Installing and Removing Doors” for details).
•
Power up devices.