ZERO KIT
52
Instruction Manual.
- Locate the hardware necessary to install the con-
trol horns for the ailerons.
- Position the control horn on the bottom of the
aileron. You will see pre-drill hole 3mm for the
horn mounting screw on the aileron.
Work the aileron up and down several
times to “work in” the hinges and check
for proper movement.
Note :
INSTALL THE AILERONS
CONTROL HORN
7.
1.
2.
- Place epoxy into hole. his will harden the threads
and prevent the crews from pulling loose.
- hread a control horn end with aluminum wash-
er, lock nut until the top edge of the end is 9mm
from the vase of the horn as shown.
3.
- Install the fap control horn using the same meth-
od as same as the aileron con trol horns.
INSTALL FLAP CONTROL HORN
4.
Summary of Contents for MASTER Edition ZERO KIT
Page 3: ...3...
Page 4: ...ZERO KIT 4 Instruction Manual...
Page 5: ...5...
Page 6: ...ZERO KIT 6 Instruction Manual...
Page 7: ...7...
Page 8: ...ZERO KIT 8 Instruction Manual...
Page 53: ...53 1 2 3 4 5 6 7...
Page 61: ...61 5 8 6...
Page 72: ...ZERO KIT 72 Instruction Manual 11 12 10 1 2 3 MOUNTING THE TAIL WHEEL...
Page 76: ...ZERO KIT 76 Instruction Manual 6 3 4 5 7 8 9 RUDDER PUSHROD INSTALLATION 1...
Page 77: ...77 2 3 4 5 6 7 8 9 10...