Operating manual [27779289/EN] - MAXO-RG single-axis controls
21.4
First commissioning
Before the first commissioning, please check:
•
Whether the motor is not damaged.
•
The entire wiring (control system) for completeness, short circuit and ground faults.
•
Whether the mains and motor are connected in the correct phase.
•
Whether the control and message rail phases are connected correctly (communica-
tion type: PCM).
•
Whether the saved configuration is valid for the application.
•
Whether the uploaded parameters are optimally aligned to the motors.