Pipe connections
8
Pipe installation must be carried out in accordance
with current norms and directives. The heat pump can
operate up to a return temperature of about 58* °C
and an outgoing temperature of about 70* °C from the
heat pump. The compressor produces up to 65* °C,
the rest is obtained using additional heating.
The other heat pumps has a max return temperature
of approximately 50 °C and an outgoing max tempera-
ture from the heat pump of approximately 60 °C.
Since the DC AWA-SS series is not fitted with shut-off
valves, these must be fitted outside of the heat pump
to make future servicing easier.
During assembly the pipes for the heat medium
and water heater and possibly hot water circulation
are routed backwards. The distance between
DC AWA-SS series and the wall ought to be 50 mm.
General
NOTE!
7KHSLSHV\VWHPQHHGVWREHIOXVKHG
RXWEHIRUHWKHKHDWSXPSLVFRQQHFWHG
VRWKDWGHEULVFDQQRWGDPDJH
FRPSRQHQWSDUWV
The size of the outlet for connecting copper pipe can be
adjusted by the fixing board.
Copper pipe connections
According to their practical situation,users can choose
the place on mainframe ( left or right ) for the out
of connecting copper pipe.
NOTE!
GHIURVWLQJWHPSHUDWXUHVHQVRUDQGRXWVLGH
WHPSHUDWXUHVHQVRUVKRXOGEHFRQQHFWHG
RXWOHWRIPDLQIUDPHDQGRXWGRRU
Copper tuble size
WRRXWGRRUXQLWWKURXJKWKHFRQQHFWLQJ
XQLW
/
/
/
Modle
Size
Gas
tube
5/
8"
5/
8"
3/
4"
3/
4"
Liquid
tube
3/
8"
3/
8"
1/
2"
1/
2"
SOLARIS DC
SOLARIS DC
SOLARIS DC
SOLARIS DC
7
9
12
15