
2021/8/19
www.sermatec-ess.com
9
Installation
Cable and Air switch preparation
Note: Be sure of all cables’ withstand
voltage, temperature-resistance equaling
to or better than the
recommended model, and complying with
relevant regulation of electrical industry.
Selection of switch
Installation Kit(Tools)
1. Electric drill (drilling bit:
φ8
mm)
2. Screwdriver (Philips screwdriver: M3
、
M6; Flat head screwdriver: M3)
3. Wire stripper(4~6mm² )
4. Wire crimper 1 (Model: H4TC0001; Manufacturer: Amphenol)
5. Wire crimper 2( OT terminal, 4~6 mm² )
6. Open-end wrench (Model: H4TW0001; manufacturer: Amphenol)
7. Multimeter
Summary of Contents for SMT-10K-TL-TH
Page 1: ...Basic Introduction to Hybrid Inverter SMT 10K TL TH...
Page 5: ...2021 8 19 www sermatec ess com 5 Technical Parameters...
Page 6: ...2021 8 19 www sermatec ess com 6 Technical Parameters...
Page 14: ...2021 8 19 www sermatec ess com 14 Installation...
Page 19: ...2021 8 19 www sermatec ess com 19 Installation...
Page 20: ...2021 8 19 www sermatec ess com 20 Installation...
Page 25: ...2021 8 19 www sermatec ess com 25 Installation Notes 4 Wiring diagram of 10K...
Page 37: ...2021 8 19 www sermatec ess com 37 Maintenance Routine Maintenance...
Page 38: ...2021 8 19 www sermatec ess com 38 Maintenance LED Status...
Page 39: ...2021 8 19 www sermatec ess com 39 Maintenance Trouble Shooting...
Page 40: ...2021 8 19 www sermatec ess com 40 Maintenance Trouble Shooting...
Page 43: ...Thanks...