2021/8/19
www.sermatec-ess.com
16
Installation
STEP 1: Check and verify PV rotary switch is at OFF position.
STEP 2: Follow the requirement to cramp and connect H4 connector to cable which
you can find from installation kits.Crimp the H4 connector to the cable as required.
STEP 3: Use multimeter to measure PV side voltage and verify ,correct polarity, ensure
open-circuit voltage is less than 1000V.
Summary of Contents for SMT-10K-TL-TH
Page 1: ...Basic Introduction to Hybrid Inverter SMT 10K TL TH...
Page 5: ...2021 8 19 www sermatec ess com 5 Technical Parameters...
Page 6: ...2021 8 19 www sermatec ess com 6 Technical Parameters...
Page 14: ...2021 8 19 www sermatec ess com 14 Installation...
Page 19: ...2021 8 19 www sermatec ess com 19 Installation...
Page 20: ...2021 8 19 www sermatec ess com 20 Installation...
Page 25: ...2021 8 19 www sermatec ess com 25 Installation Notes 4 Wiring diagram of 10K...
Page 37: ...2021 8 19 www sermatec ess com 37 Maintenance Routine Maintenance...
Page 38: ...2021 8 19 www sermatec ess com 38 Maintenance LED Status...
Page 39: ...2021 8 19 www sermatec ess com 39 Maintenance Trouble Shooting...
Page 40: ...2021 8 19 www sermatec ess com 40 Maintenance Trouble Shooting...
Page 43: ...Thanks...