Installation
The recommended connected panels is to exceed 10%-20% of standard number
Connect PV cable
1. Make sure all switches are at closed position before electrical connection.
2.Only qualified installation person can implement installation of AC and DC input cable.
It is strictly prohibited to connect positive pole( PV1+
、
PV2+
、
BAT+) and negative (PV1-
、
PV2-
、
BAT+)
reversely or incorrectly. Otherwise it would affect normal operation, or even cause damage and other serious
consequence.
The length of external cable to PV side and battery side is suggested to be less than 30m.
The minimum insulation resistance to ground of PV panels must exceed 40k, there is a risk of shock hazard if
the requirement of minimum resistance is not met.
Summary of Contents for SMT-10K-TL-TH
Page 1: ...Basic Introduction to Hybrid Inverter SMT 10K TL TH...
Page 5: ...2021 8 19 www sermatec ess com 5 Technical Parameters...
Page 6: ...2021 8 19 www sermatec ess com 6 Technical Parameters...
Page 14: ...2021 8 19 www sermatec ess com 14 Installation...
Page 19: ...2021 8 19 www sermatec ess com 19 Installation...
Page 20: ...2021 8 19 www sermatec ess com 20 Installation...
Page 25: ...2021 8 19 www sermatec ess com 25 Installation Notes 4 Wiring diagram of 10K...
Page 37: ...2021 8 19 www sermatec ess com 37 Maintenance Routine Maintenance...
Page 38: ...2021 8 19 www sermatec ess com 38 Maintenance LED Status...
Page 39: ...2021 8 19 www sermatec ess com 39 Maintenance Trouble Shooting...
Page 40: ...2021 8 19 www sermatec ess com 40 Maintenance Trouble Shooting...
Page 43: ...Thanks...