Basic Introduction to 
Hybrid Inverter SMT-10K-
TL-TH 

Summary of Contents for SMT-10K-TL-TH

Page 1: ...Basic Introduction to Hybrid Inverter SMT 10K TL TH...

Page 2: ...2021 8 19 www sermatec ess com 2 Product Description Composing PV Battery Load and Grid together to realize high efficient storage solution for household rooftop users Could be set to 6kW 8kW 10kW...

Page 3: ...2021 8 19 www sermatec ess com 3 CONTENT Product Description Inverter Overview Warranty System Diagram Technical Parameters Installation Working Modes Maintenance...

Page 4: ...Overview 1 PV Connector 2 PV Switch 3 Battery Connector 4 GPRS Module Interface 5 WiFiAntenna Interface 6 Communication Interface 7 Waterproof Vent Valve 8 AC Back up Load Connector 9 PE Connection Po...

Page 5: ...2021 8 19 www sermatec ess com 5 Technical Parameters...

Page 6: ...2021 8 19 www sermatec ess com 6 Technical Parameters...

Page 7: ...edge of the hybrid Inverter During the installation process always observe the safety precautions and local safety regulations before the catalogue of this manual Do not operate or maintain the inside...

Page 8: ...2021 8 19 www sermatec ess com 8 Installation Unpacking inspection Unpack the package review the check list...

Page 9: ...model and complying with relevant regulation of electrical industry Selection of switch Installation Kit Tools 1 Electric drill drilling bit 8mm 2 Screwdriver Philips screwdriver M3 M6 Flat head screw...

Page 10: ...ure the installation wall is vertical to the ground If it is sloping tilt angle is only allowed to be less than 15 3 Ensure installation wall is solid enough to meet the requirements of load bearing f...

Page 11: ...Mounting 1 Mark mounting hole on the wall Drill hole with 8mm diameter of bit Ensure a depth of 80mm 2 Hammer expansion tube into the wall Mount bracket on the wall keep aligned with the holes 3 Moun...

Page 12: ...2021 8 19 www sermatec ess com 12 Installation 4 Secure the inverters with M6 screw on the right side 5 Install anti theft lock if necessary Option equipped by user...

Page 13: ...ter System Connection Diagram 1 PV1 Connector 2 PV2 Connector 3 PV Switch 4 Battery Connector 5 GPRS Module Interface 6 WiFiAntenna Interface 7 DRED Interface 8 Communication Interface 9 Waterproof Ve...

Page 14: ...2021 8 19 www sermatec ess com 14 Installation...

Page 15: ...f AC and DC input cable It is strictly prohibited to connect positive pole PV1 PV2 BAT and negative PV1 PV2 BAT reversely or incorrectly Otherwise it would affect normal operation or even cause damage...

Page 16: ...position STEP 2 Follow the requirement to cramp and connect H4 connector to cable which you can find from installation kits Crimp the H4 connector to the cable as required STEP 3 Use multimeter to me...

Page 17: ...talled indoor for details please refer to battery Manufacture s user manual Suggestion Batteries must be installed with a distance to each other details please refer to battery manufacture s user manu...

Page 18: ...connector to the cable as required Battery cable size 6mm STEP 2 Use multimeter to measure Battery side voltage and verify correct polarity ensure open circuit voltage is less than 800V STEP 3 Connec...

Page 19: ...2021 8 19 www sermatec ess com 19 Installation...

Page 20: ...2021 8 19 www sermatec ess com 20 Installation...

Page 21: ...and battery input cable to interfaces Don t reversely connect AC Backup load connector and AC Grid connector STEP 1 Cable OD 16 20mm pry inner ring out of connector STEP 2 The connector and cable are...

Page 22: ...id voltage is less than high limit of voltage required by all national grid standard STEP 4 Connect connector to AC Load interface and grid interface rotate and lock them Note Do not connect reverse t...

Page 23: ...2021 8 19 www sermatec ess com 23 Installation Notes 1 Back up side could not be connected with grid directly 2 Back up side could not be connected with any AC generator...

Page 24: ...llation Notes 3 Switch specifications of AC side The air switch usually chooses 1 2 1 5 times of maximum input output current Leakage circuit breaker of household usually chooses 30 100mA and industri...

Page 25: ...2021 8 19 www sermatec ess com 25 Installation Notes 4 Wiring diagram of 10K...

Page 26: ...conditions have strict requirements on the connected load The inductive load cannot exceed 1 3 of the maximum operating power of the inverter 6 One smart meter could not be connected with multiple in...

Page 27: ...lug the wire connector of the waterproof cover plate in the accessory into the corresponding interface of the Hybrid Inverter STEP 3 Fix firmly by screw STEP 4 Screw up water proof cylinder connect th...

Page 28: ...nments for DRED Power Meter and BMS as follows If you need to use DRED function please put the left dip switch to the upper position The inverter shall detect and initiate a response to all supported...

Page 29: ...2021 8 19 www sermatec ess com 29 Installation There are only two choices for Smart Meter for 10K inverter Acrel Three Phase ACR10R D10TE4 C45 Eastron Three Phase SDM630MCT V2...

Page 30: ...Module Optional and Wi Fi Antenna Connection If the user selects the GPRS module remove the dust cover plate of the GPRS module interface and install the GPRS module The GPRS socket pin assignments a...

Page 31: ...2021 8 19 www sermatec ess com 31 Installation Installation check After the Hybrid Inverter is installed be sure to check the installation according to the following table...

Page 32: ...p Close air switch of grid side Turn on DC rotary switch Turn on the breaker of battery Startup the system through Sermatec Mate APP Power off Shut down the system through Sermatec Mate APP Turn off t...

Page 33: ...2021 8 19 www sermatec ess com 33 Working Modes Four Working Modes 1 General Mode 2 Energy Storage Mode 3 Micro Grid Mode 4 Peak and Bottom Mode...

Page 34: ...tery Grid When PV is insufficient Battery and Grid supplies power to the load together with insufficient PV 2 Energy Storage Mode Suitable for Areas with Unstable Grid PV and Grid supplies power to th...

Page 35: ...ry will supply power to the load together with insufficient PV 4 Peak and Bottom Mode Suitable for Areas with Changing Electricity Price During bottom period PV and Grid charge the Battery and supply...

Page 36: ...on of inverters must be trained and qualified with sufficient knowledge of electrical system 2 It is required to implement power down before system clean confirming reliability of electrical connectio...

Page 37: ...2021 8 19 www sermatec ess com 37 Maintenance Routine Maintenance...

Page 38: ...2021 8 19 www sermatec ess com 38 Maintenance LED Status...

Page 39: ...2021 8 19 www sermatec ess com 39 Maintenance Trouble Shooting...

Page 40: ...2021 8 19 www sermatec ess com 40 Maintenance Trouble Shooting...

Page 41: ...om 41 Warranty 5 Years Warranty Calculated 6 months after out from factory or installation date which comes the first The Replacement with be sent together with dealer s next order suggest that dealer...

Page 42: ...surge pests and fires etc Modify the product change the design or replace the parts without authorization from Sermatec Intentional destruction or defilement make indelible marks theft etc Normal wea...

Page 43: ...Thanks...