Seraphim SRP 6MA-BG Series Installation Manual Download Page 8

 If the connector is damaged or deformed,

Before installation, make sure that the connector is well protected and  there 

should be no foreign matter such as soil, sand and gravel in the connector. If any, 

it must be cleaned before installation. 
the connector must be replaced before use; if there is no spare connector, please 

contact seraphim in time

1"3".&5&34

14

.&$)"/*$"-*/45"--"5*0/*1"3".&5&34

3&."3

K

15

."*/5&/"/$&

Clean the glass surface of the module regularly with clean water and a soft 
sponge or cloth. A mild, non-abrasive cleaning agent may be used to remove 
stubborn dirt. 

Check the electrical, grounding and mechanical connections every six months to 

verify that they are clean, secure, undamaged and free of corrosion. 

If any problem arises, consult a professional for suggestions. 

Caution: observe the maintenance instructions for all components used in the 
system, such as support frames, charging regulators, inverters, batteries etc.   

The parameters may be updated time to time, accurate parameters please 
check on our website: http://www.seraphim-energy.com or email to our techni

-

cal support team: [email protected]

INSTALLATION GUIDE FOR SERAPHIM 

DUAL GLASS PHOTOVOLTAIC MODULE

INSTALLATION GUIDE FOR SERAPHIM 

DUAL GLASS PHOTOVOLTAIC MODULE

 

:_VK

:_VK

:_VK

:_VK͹SSͨͫSS

:_VK͹SSͨͫSS

:_VK͹SSͨͫSS

:_VK͹SSͨͫSS

:_VK͹SSͨͫSS

:_VK͹SSͨͫSS

:_VK͹SSͨͫSS

:_VK͹SSͨͫSS

:_VK

REMARK

 installation

Module

Type

Landscape

Portrait

 installation

Cable Length:

Cable Length:

Cable Length:

Cable Length:

4UZK :NOY\KXYOUTUL:;</TYZGRRGZOUT-[OJKGXKKLLKIZO\KLXUS4U\

9

ͫ[TZOR

it is replaced by new version.

Remark

If conversion cable is needed, see attachment1 for  details.

.

Summary of Contents for SRP 6MA-BG Series

Page 1: ...PHOTOVOLTAIC MODULE JIANGSU SERAPHIM PHOTOVOLTAIC SYSTEM CO LTD ADDRESS JIANGSU CITY OF CHANGZHOU PROVINCE WANG ZHEN HENG ROAD NO 1 2 TELEPHONE 86 519 68788166 FAX 86 519 88786181 MAILBOX info seraphi...

Page 2: ...lers should assume all risks of injury that might occur during installation including but not limited to the risk of electric shock One single PV module may generate more than 30V DC when exposed to d...

Page 3: ...including wires and cables connectors charging regulators inverters storage batteries recharge able batteries etc Under normal outdoor conditions the current and voltage generated will differ from tho...

Page 4: ...sunlight resources In the Northern Hemisphere the module should typically face south and in the Southern Hemisphere the modules should typically face north The most optimistic installation angle varie...

Page 5: ...ithstand a downward force of up to 5400 Pa 550 kg m2 the modules shall be fixed on the bracket with the long side of the module using a minimum of four clamps Please make sure to use at least of two p...

Page 6: ...xed on the bracket with the long side of the module using a minimum of four screws Please make sure to use at least of two purlins behind the modules to support the modules The selection and installat...

Page 7: ...stem voltage the Voc temperature coefficient feature and the extreme low temperature of installation location must be taken into consideration when calculate the Voc of the PV string The PV modules co...

Page 8: ...ny problem arises consult a professional for suggestions Caution observe the maintenance instructions for all components used in the system such as support frames charging regulators inverters batteri...

Page 9: ...eet any of the following conditions 1 When the DC side input terminal of the inverter or combiner box is original MC4 2 When the manufacturer of inverter or combiner box requires series DC input bus t...

Reviews: