
嗡
9
8
嗡
.&$)"/*$"-*/45"--"5*0/
INSTALLATION GUIDE FOR SERAPHIM
DUAL GLASS PHOTOVOLTAIC MODULE
INSTALLATION GUIDE FOR SERAPHIM
DUAL GLASS PHOTOVOLTAIC MODULE
:G
ble 2
:
ype
Loads
6G
Clamp Length
Installation Drawing
:_VK
≥SS
:_VK
:_VK
:_VK
.
SE
RI
A
L N
UM
BE
R
250
350
250
350
L/2
L
SE
RI
AL NUM
BE
R
SE
RI
AL NUM
BE
R
350
450
350
450
SERIAL
NUMBER
SERIAL
NUMBER
L
250
350
250
350
L/2
SERIAL
NU
M
BER
350
450
350
450
≥SS
≥SS
≥SS
$-".1*/45"--"5*0/
Figure 3 Double-side clamp
Figure 4 Single-side clamp
Figure 5 Double-side clamp installation
Figure 6 Single-side clamp installation
In order to ensure that the modules can withstand a downward force of up to
5400 Pa (550 kg/m2), the modules shall be fixed on the bracket with the long
side of the module, using a minimum of four clamps. Please make sure to use at
least of two purlins behind the modules to support the modules.
The selection and installation of the clamps shall obey the requirement accord
ing to table 3. Otherwise the module may not satisfy the mechanical load and
have the risk of broken.
The dual glass module with frame is designed for clamp installation . It needs
the clamps, bolts, nuts and washers to fix on the bracket(as shown in figure 5 and
figure 6). Sufficient torque should be applied to the bolts to ensure stable reinfo-
.
M
*
N
0
2
~
6
1
s
i
w
e
r
c
s
8
M
r
o
f
e
u
l
a
v
e
u
q
r
o
t
e
c
n
e
r
e
f
e
r
e
h
T
.t
n
-rceme
.&$)"/*$"-*/45"--"5*0/