11
3. Align keyway of connector. The wide key is aligned with the
purge port. Once aligned, wiggle the connector back and
forth slightly to start the seal to seat properly.
4. Tighten threaded ring. The ring will seat fully when there is
about a 1/16-inch (1.5mm) gap to the base.
.
5. Attach cable strain relief as needed.
(see Cable Strain Relief, p.12)
6. Attach pole sections as needed.
(see Optional Tank Flange Mount and Pole System, p. 28)
7. Attach auxiliary light modules as needed.
(see Optional Auxiliary Lights, p.27)
8. Attach power cord to the rated power source.
9. Power ON reel controller at blue power switch.
Summary of Contents for HD-PTZx35
Page 1: ...Operation Manual Version 1 1 2020 Sensor Networks Inc...
Page 2: ...2...
Page 7: ...7 Reel Controller Overview...
Page 8: ...8...
Page 9: ...9 Compact Controller Overview...
Page 31: ...31...