508.366.1488 | www.semshred.com

 

 

4.

 

Startup and Operation   

Important:

 Most problems occur during the first hours of operation. These can be eliminated by careful review of 

the operating, maintenance and recommended service instructions. 

Warning:

 Use only intended materials in disintegrator or severe jamming may occur. See page 18.  

New Operators:

 It is recommended to give new operators approximately 2 hours for a break in period beginning 

with a slow feed rate to familiarize themselves with the device. 

4.1 Pre-Start-Up Procedure 

 

 

Familiarize yourself with all controls and button locations, as well as this manual. 

 

Familiarize yourself with the acceptable media for this device.  

 

Ensure that all guards and covers are in place. 

 

Ensure that the area is clean. 

 

Check input area for debris, discarded tools, etc.  

 

4.2 Controls 

 

 

 

Start:

 Turns the motors on, one at a time to avoid large current spikes. 

 

Reverse: Used to manually unjam the stage 1 chamber, will also illuminate during automatic unjamming of stage 1. 

 

Stop:

 Stops the stage 1 chamber and begins the timed shutdown for the stage 2 chamber. 

 

Reset:

 Used to reset the machine after stage 1 is unjammed. 

o

 

Jam Sensor: When the reset light is blinking, check stage 2 for a jam and check belt tension.  

o

 

When this light is solid, check the stage 1 chamber for a jam. 

o

 

The reset button must be pressed in order for any other button to work on the device, unless it is 
completely powered down. 

 

Bin Full:

 When this indicator is illuminated, the bin underneath the stage 1 chamber is full and the machine will 

begin a timed shutdown and shut off the stage 1 chamber.  

Summary of Contents for 2SSD

Page 1: ...AN 004 Created 8 5 19 ECN 00489 For Serial Numbers 19212 and up For sales service parts and customer support contact us SECURITY ENGINEERED MACHINERY 5 Walkup Drive Westborough MA 01581 info semshred...

Page 2: ...in this collateral SEM does not warrant that the equipment will work properly in all environments and applications and makes no warranty or representation either implied or expressed with respect to...

Page 3: ...aring loose clothing neckties dangling jewelry or long hair which may become entangled in the cutting chamber 4 Maintenance or repair of this equipment should be performed only by trained authorized s...

Page 4: ...artup Procedures 10 4 4 Feeding and Operating Procedures 10 4 5 Clearing a Jam Accessing Stage 2 Cutting Chamber 12 4 6 Shutdown Procedures 18 4 7 Shreddable Materials 18 4 8 Unacceptable Materials 18...

Page 5: ...oor CE Serial Number Tag Filter Access Panel Front of Cabinet IEC60320 Connector Current Relay E Stop Hour Meter Left Side Power Cord Rear of Unit E Stop Drop Chute Collection Bin Hopper Stage 2 Cutti...

Page 6: ...6 508 366 1488 www semshred com Filter Power Cord Contactors Overloads Rear w Cover Removed Electrical Panel Fuses Electrical Panel Stage 2 Chamber Stage 1 Chamber PLC...

Page 7: ...strap cutters Remove the Model 2SSD from the pallet lift truck Note It is recommended to lift the Model 2SSD from the front with the forks 30 apart or using the fork pockets beneath the unit if order...

Page 8: ...o is versed in the applicable electrical codes of the country region in which this device is being installed Phase All Model 2SSDs are designed for 3 phase electricity Voltage Frequency Full Load Amps...

Page 9: ...ds and covers are in place Ensure that the area is clean Check input area for debris discarded tools etc 4 2 Controls Start Turns the motors on one at a time to avoid large current spikes Reverse Used...

Page 10: ...al media into this unit Doing so will damage the unit and void your warranty b Caution Feeding drives too quickly may cause a jam or damage the screen 2 When the collection bin is full the BIN FULL li...

Page 11: ...the unit If the unit is still jammed the media may have to be removed manually 6 To release the jam de energize the unit recommended that each site has a LOTO program in place then unbolt and remove...

Page 12: ...g Cover If for any reason the bearing cover or either bolt holding the cover on is removed or needs to be complete steps 1 4 of the procedure on page 13 and return to this section Remove no more than...

Page 13: ...t tag out procedures LOTO 2 Open front door 3 Remove the two painted side bolts holding the cutting chamber drawer in place see figure 3 4 Note Never operate the machine without the bolts in place Req...

Page 14: ...ull cutting chamber drawer all the way out see figure 6 a Brush should clear off any debris on top of the hopper and remain partially on the hopper once the drawer has been fully pulled out Figure 6 P...

Page 15: ...15 508 366 1488 www semshred com b Requires 7 16 socket wrench c Bolts to be removed Figure 8 Figure 9 Belt Side Figure 10...

Page 16: ...ting chamber the screen may need to be removed see page 22 7 Loosen the bolts of the brush and move it up so it clears the hopper Snug one bolt so it stays in position 8 Replace the gasket and hopper...

Page 17: ...rush with the front edge of the hopper approximately below the bottom of the stage 1 cutting chamber See figures 14 and 15 Make sure the brush is positioned 1 4 inch from surface shown in pictures abo...

Page 18: ...cleanup and maintenance procedures 4 7 Shreddable Materials The Model 2SSD is capable of destroying the following products 1 solid state hard drives CD DVD optical media with select screen sizes Thum...

Page 19: ...rator Warning Shredded material can be sharp SEM recommends wearing gloves Stage 2 Cutting Chamber See page 10 for instructions on accessing the stage 2 cutting chamber 5 1 Daily Cleaning 1 Disconnect...

Page 20: ...avoid excessive noise dust buildup and to ensure proper air filtration SEM recommends cleaning every 500 drives Remove the back panel opposite the cutting chamber access door Remove the plug by holdin...

Page 21: ...f the device Warning Failure to change filters may result in hazardous particle emissions Instructions Requires 5 32 Allen wrench Unscrew 4 screws on the corners of the filter panel cover and remove c...

Page 22: ...ith extension and lower it carefully to not spill any remaining material 4 Inspect screen for damage a Note that material resting on the screen is not considered to be adequately destroyed b Particle...

Page 23: ...ting bolts on the motor base 7 Use the tensioning bolt on the frame to adjust the motor a See Fig 3 b Adjusting the screw clockwise will tighten the belt and counterclockwise will loosen or allow for...

Page 24: ...material being destroyed In all cases knives should be changed and returned for sharpening at a minimum of 25 hours of usage to avoid excess dust and potential jams or post every 500 devices Note SEM...

Page 25: ...eler gauge Spare Knives and Sharpening To avoid downtime it is best to have a spare set of sharp knives on hand at all times SEM offers spare knives and sharpening services Contact SEM Customer Servic...

Page 26: ...quires 5 16 Allen drive socket bit 3 Remove bolts from bed knives o Replace one knife at a time o Make sure to keep track of the bed knife clamps 4 Wipe bed knife clean and place atop bed knife seat w...

Page 27: ...t Flat side of washer should be touching clamp 6 Repeat steps 4 6 for the second bed knife 7 Wipe off rotor flats and rotor knives before attaching them one at a time with 9 3 8 24 x 3 4 socket head c...

Page 28: ...while spinning the rotor when one or two rotor knives come into contact with the feeler gauge This indicates proper clearance There should be little resistance just a noise If the rotor stops there is...

Page 29: ...x bolt and 5 16 lock washer Requires 1 2 wrench 12 Do a final check of bolt torques assembly bolt tightness and knife gapping Warning Failure to sharpen or replace knives will result in excess dust fr...

Page 30: ...te Press the STOP pushbutton before making any changes to the current relay The power does not need to be off for this adjustment Remove cover on left side of device below the hour meter to expose cur...

Page 31: ...place just enough for the shield to move Push the drawer in and pull the shield up until it touches stage 1 cutting chamber Tighten the front screw Pull the drawer out until the middle screw is in lin...

Page 32: ...odel 2 SSD HF 2SSD 7 Case of 50 Anti Static Waste Collection Bags SSDIS ASB 8 Toolkit 553TK200 9 4 Gallon Dual Stage Vacuum 9272410 10 Vacuum Bags 2 bag 9196400 11 Replacement Vacuum Filter 9034100 Fo...

Reviews: