■Fix the plate to the (4) handle or to the plate in correspondence
of the holes (using the screws which are in the kit k40). The plate
must be fixed in order to allow the insertion of the retainer (1)
beginning from up to down.
■ Insert the sheathing retainer on the cables (1)
■ Screw the counter-nuts (accessories of the Kit
K40) to the end of the threaded part of the control
cables
■ Screw completely the gas plate connector (3) to
the accelerator control
■ Insert the sheathing retainer in the fixation plate, control if
connecting the connector (3) in the pawl of the plate of control
of the accelerator, the housing of the cotter pin is in
correspondence of one of three holes in the sheathing
retainer.
In contrary case unscrew the plate connector to achieve the
correct position.
■ Insert the same connector in the plate of control of the
accelerator
,
and ensure the connector through the gripping of the
spring fixed on the plate connector
。
■ Insert in the hole of the sheathing retainer, that corresponds to
the housing of the same sheathing , the fixing cotter pin (5).
■ Screw the other fixation plate sheathing retainer to the basin in
correspondence of the holes which are on one side of the gears
handle. Insert in the plate the sheathing retainer mounted on the
cables of the gears control.
■ Screw completely the gears handle connector on (2) the gears
control cables and make the regulation of the distance between
the sheathing retainer and the gear control handle for the gas
control cable.
■ Insert the pin on the connector of the gears handle in the
housing which is on the same handle, push the ring nut of the pin
and rotate the pin to put the retainer of the pin on the beat of the
handle.
■ Insert in the sheathing retainer hole, which corresponds to the
housing of the sheathing, the fixing cotter pin (5).
■ Fix the position of the gears handle connectors and of the gas
plate with the counter-nuts
Picture No.46
Control at the end of the operations the correct
functioning of the remote control box.
19