Selbach BT 40 Operating Manual Download Page 6

Ball valve 

Air tube 
connection 

To remove the tap head, push the lever up and remove the tap head from the seal. Afterwards reattach the 
protective cap. 

 

 
 
 
 

3.20 Pouring draught beer 

The art of pouring draught beer requires to produce a nice smooth head on top of the beer and to lose a small 
amount of the beer’s own CO

2

 at the same time. This can only be achieved by brisk pumping. For a tried and 

tested pouring method, please follow the instructions below. 
 
Observe the following rules: 
 
Rinse the glass with 

fresh, cold

 water.  

 
Hold the pre-rinsed glass under the 

fully open 

tap at an angle that allows the beer to run down the side of the 

glass.  
 
Allow the 

half filled 

glass to stand for about 1 minute. 

 
Then top up the rest. Generally speaking, the beer tap spout should 

not 

be dipped into the beer as this causes 

a leak or escape of carbon dioxide.  
 
After another pause of about 

1 minute 

apply a head by applying a quick opening and closing action. 

 
The pouring process described above requires a mere 3 minutes and guarantees premier quality. Slower 
pouring of draught beer robs the beer of its freshness. 

 
 

3.30 Commissioning   

        Model with membrane pump 

 

• 

Connect air connection valve to appliance (3/4“ thread adapter) 

• 

Open ball valve 

• 

Connect tank connection parts to beverage 
tank. 

• 

Set desired temperature at the thermostat. 

• 

Connect to network. 

 
 
Once the operation temperature has been 
reached the appliance will be ready for 
operation. (unit switches off) 

Summary of Contents for BT 40

Page 1: ...Fax 49 21 95 68 01 188 Email info selbach com Internet http www selbach com Operating manual Party Keg BT 40 The device described in this manual may only be put into operation provided the operators a...

Page 2: ...3 00 COMMISSIONING 5 3 10 CONNECTING 5 3 20 POURING DRAUGHT BEER 6 3 30 COMMISSIONING MODEL WITH MEMBRANE PUMP 6 3 40 TUBING DIAGRAM 7 3 41 Tubing diagram party keg with membrane pump 7 3 41 Tubing d...

Page 3: ...y only be operated and connected by suitably trained personnel Adjustments maintenance and repair work on the open or live device may only be performed by a specialist As with all technical equipment...

Page 4: ...correctly installed Observe all applicable rules and regulations during connecting 1 51 Beer connection The beer connection is connected via an adapter with a 5 8 thread on the underside of the devic...

Page 5: ...not allow particles of dirt to enter the gas and beer lines Never operate the compressed gas cylinders without pressure reducer and ensure that they are positioned upright at all times and protected a...

Page 6: ...the side of the glass Allow the half filled glass to stand for about 1 minute Then top up the rest Generally speaking the beer tap spout should not be dipped into the beer as this causes a leak or es...

Page 7: ...to CO2 cylinder fitted to pressure reducer Ensure correct position of party keg after connecting Beer tube Beer tube and gas tube attached to tap head CO2 tube CO2 cylinder Attention Protect against t...

Page 8: ...8 3 41 Tubing diagram party keg with membrane pump Beer tube Ball valve valve position open Air connection tube Tap head Model depending on type of beer to be poured...

Page 9: ...rms may grow that as a result of their being present everywhere in the ambient air Therefore it is necessary to keep these areas of the beer pump clean by daily cleaning in particular the tap and drip...

Page 10: ...oes nothing to inhibit their growth For that reason at certain intervals chemical cleaning is also required Store balls safely at a place where they are protected against contamination DIN 6650 stipul...

Page 11: ...ak evacuate and fill with refrigerant R134a Replace compressor Appliance does not turnoff Thermostat defective Leak in cooling system Replace thermostat Remove leak evacuate and fill with refrigerant...

Page 12: ...000 Tap head for basket fitting 22 0412 0000 Combination tap head 22 0414 0000 Pressure reducer 22 0415 0000 Open ended spanner for pressure reducer 91 0101 0000 CO2 tube G 26 0629 0000 Beer tube G 5...

Reviews: