Selbach BT 40 Operating Manual Download Page 4

 

1.30 Spare parts 

Assemblies or components may only be replaced with identical spare parts. 

 

1.40 Transportation/storage 

Any damage discovered after delivery must be reported immediately to the transport company. If 
necessary, take suitable measures to prevent the device from being put into operation. The device may 
only be stored in a dry, dust-free environment at a temperature between 0 and 60 degrees.  

 

1.50 Electrical connection 

Electrical tasks may only be carried out once: 
 

 

The electrical system has been disconnected from the voltage supply and prevented from being 
switched on again accidentally 

 

The absence of voltage has been checked 

 

You have make sure that additional monitoring and protective devices for the control system are 
correctly installed. 

 
Observe all applicable rules and regulations during connecting. 

 

1.51 Beer connection 

The beer connection is connected via an adapter with a 5/8" thread on the underside of the device.  
 

1.52 Operation 

Should the device deviate in any way from its normal operation, always take it out of operation if in doubt 
and mark it suitably in order to prevent it from being started up again by a third party. Also notify the 
customer service department. 

 
 

1.60 Service 

All service instructions contained in the manual concerning servicing work must be observed without fail.  

 
 

2.00 Proper use 

Selbach beverage chillers and beverage pumps are designed for dispensing chilled drinks. These appliances 
are utilised in, among other things, catering and for recreational purposes. 
 
Selbach beverage chillers are licensed only for the above-mentioned field of application and therefore 
unsuitable for cooling down hot liquids, chemicals or the like. 

 
 

Summary of Contents for BT 40

Page 1: ...Fax 49 21 95 68 01 188 Email info selbach com Internet http www selbach com Operating manual Party Keg BT 40 The device described in this manual may only be put into operation provided the operators a...

Page 2: ...3 00 COMMISSIONING 5 3 10 CONNECTING 5 3 20 POURING DRAUGHT BEER 6 3 30 COMMISSIONING MODEL WITH MEMBRANE PUMP 6 3 40 TUBING DIAGRAM 7 3 41 Tubing diagram party keg with membrane pump 7 3 41 Tubing d...

Page 3: ...y only be operated and connected by suitably trained personnel Adjustments maintenance and repair work on the open or live device may only be performed by a specialist As with all technical equipment...

Page 4: ...correctly installed Observe all applicable rules and regulations during connecting 1 51 Beer connection The beer connection is connected via an adapter with a 5 8 thread on the underside of the devic...

Page 5: ...not allow particles of dirt to enter the gas and beer lines Never operate the compressed gas cylinders without pressure reducer and ensure that they are positioned upright at all times and protected a...

Page 6: ...the side of the glass Allow the half filled glass to stand for about 1 minute Then top up the rest Generally speaking the beer tap spout should not be dipped into the beer as this causes a leak or es...

Page 7: ...to CO2 cylinder fitted to pressure reducer Ensure correct position of party keg after connecting Beer tube Beer tube and gas tube attached to tap head CO2 tube CO2 cylinder Attention Protect against t...

Page 8: ...8 3 41 Tubing diagram party keg with membrane pump Beer tube Ball valve valve position open Air connection tube Tap head Model depending on type of beer to be poured...

Page 9: ...rms may grow that as a result of their being present everywhere in the ambient air Therefore it is necessary to keep these areas of the beer pump clean by daily cleaning in particular the tap and drip...

Page 10: ...oes nothing to inhibit their growth For that reason at certain intervals chemical cleaning is also required Store balls safely at a place where they are protected against contamination DIN 6650 stipul...

Page 11: ...ak evacuate and fill with refrigerant R134a Replace compressor Appliance does not turnoff Thermostat defective Leak in cooling system Replace thermostat Remove leak evacuate and fill with refrigerant...

Page 12: ...000 Tap head for basket fitting 22 0412 0000 Combination tap head 22 0414 0000 Pressure reducer 22 0415 0000 Open ended spanner for pressure reducer 91 0101 0000 CO2 tube G 26 0629 0000 Beer tube G 5...

Reviews: