3.00 Commissioning 

• 

Protect the CO

cylinder from toppling over by means of a cylinder holder. 

• 

Screw the cylinder pressure reducer to the CO

cylinder. 

• 

Connect the tank connection parts to the beverage tank. 

• 

Open the carbonic acid stopcock. 

• 

Set pressure reducer to the required pressure. 

• 

Set desired temperature at the thermostat. 

• 

Connect to network. 

 
 
 

Never operate the appliance when toppled over!

 

 
 
 
 

3.10 Connecting 

Ensure connection tightness for all connections, in particular compressed gas carrying parts (such as pressure 
reducer, admission tube, back pressure gas tube, interim pressure governor). Do not allow particles of dirt to 
enter the gas and beer lines.  
 
Never operate the compressed gas cylinders without pressure reducer and ensure that they are positioned 
upright at all times and protected against toppling over. Only in this manner can you ensure that none of the 
liquid CO

2

 flows through the pressure reducer resulting in extremely high pressures being built up that may 

cause the keg to detonate 

(risk of fatal injury!

). 

 
Clean the tap head every time you exchange a keg. 
 
Push the tap head, with the beer and CO

lines connected, up to the end stop above the seal. 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Push the lever down. This opens the valves for beer and CO

2

 and you can now start pouring draught beer. If the 

tap head is fitted with a stopcock you will have to open it after placing and close it before removing the tap head.  

 

 
 

Summary of Contents for BT 40

Page 1: ...Fax 49 21 95 68 01 188 Email info selbach com Internet http www selbach com Operating manual Party Keg BT 40 The device described in this manual may only be put into operation provided the operators a...

Page 2: ...3 00 COMMISSIONING 5 3 10 CONNECTING 5 3 20 POURING DRAUGHT BEER 6 3 30 COMMISSIONING MODEL WITH MEMBRANE PUMP 6 3 40 TUBING DIAGRAM 7 3 41 Tubing diagram party keg with membrane pump 7 3 41 Tubing d...

Page 3: ...y only be operated and connected by suitably trained personnel Adjustments maintenance and repair work on the open or live device may only be performed by a specialist As with all technical equipment...

Page 4: ...correctly installed Observe all applicable rules and regulations during connecting 1 51 Beer connection The beer connection is connected via an adapter with a 5 8 thread on the underside of the devic...

Page 5: ...not allow particles of dirt to enter the gas and beer lines Never operate the compressed gas cylinders without pressure reducer and ensure that they are positioned upright at all times and protected a...

Page 6: ...the side of the glass Allow the half filled glass to stand for about 1 minute Then top up the rest Generally speaking the beer tap spout should not be dipped into the beer as this causes a leak or es...

Page 7: ...to CO2 cylinder fitted to pressure reducer Ensure correct position of party keg after connecting Beer tube Beer tube and gas tube attached to tap head CO2 tube CO2 cylinder Attention Protect against t...

Page 8: ...8 3 41 Tubing diagram party keg with membrane pump Beer tube Ball valve valve position open Air connection tube Tap head Model depending on type of beer to be poured...

Page 9: ...rms may grow that as a result of their being present everywhere in the ambient air Therefore it is necessary to keep these areas of the beer pump clean by daily cleaning in particular the tap and drip...

Page 10: ...oes nothing to inhibit their growth For that reason at certain intervals chemical cleaning is also required Store balls safely at a place where they are protected against contamination DIN 6650 stipul...

Page 11: ...ak evacuate and fill with refrigerant R134a Replace compressor Appliance does not turnoff Thermostat defective Leak in cooling system Replace thermostat Remove leak evacuate and fill with refrigerant...

Page 12: ...000 Tap head for basket fitting 22 0412 0000 Combination tap head 22 0414 0000 Pressure reducer 22 0415 0000 Open ended spanner for pressure reducer 91 0101 0000 CO2 tube G 26 0629 0000 Beer tube G 5...

Reviews: