Section 4: Installation
Installation Procedures
2018 Insta-Berm (Frame) Operations Manual
(Version D)
12
We Engineer Solutions
5.
The shipping container should be retained for storage or for shipping the berm to a new location.
Note how the liner is folded for easy return to the container.
6.
If the berm is to be equipped with a groundsheet, spread the groundsheet out first. The ground-
sheet must be at least 2-3’ larger then the berm itself.
7.
Place the groundsheet at one corner of
the site.
8.
Unfold the groundsheet and centre it
along one edge of the site.
Important Note
If the berm is equipped with an optional groundsheet, the groundsheet will be the smaller of the
two.
Groundsheet.