Section 4: Installation
Installation Procedures
2018 Insta-Berm (Frame) Operations Manual
(Version D)
11
We Engineer Solutions
If the ground surface is too rough or irregular, it must be prepared by placing 1-2" (25-50 mm) of pea gravel
covered by 1-2" (25-50 mm) of sand or soil. This also provides some drainage and helps keep water away
from the liner.
The ground supporting the Insta-Berm system must be firm enough to prevent the berm from settling after
filling, otherwise the berm liner may stretch and rupture. The ground must also be firm enough to prevent
the frame support legs from sinking, should the berm fill with liquid.
A groundsheet is recommended to protect the bottom surface of the berm from sharp objects (available from
SEI Industries). An inside chafing liner is also available.
Assembling the Berm
Move the crate to the assembly site and follow the procedures below:
1. Open the crate.
2. Read the operator’s manual.
3. Tip the crate and roll the liner and berm out
OR lift the liner out with straps.
4. Roll the liner and berm to move it. Do not
drag.