37
ASSEMBLY AND INSTALLATION
10
Undo the cord clamp and connect 2 connectors to the projector. Fasten the D-SUB 15P in place with 2
fastening screws. After connecting the connector, affix the cord clamp.
11
Close the service door and lock it with the mater key.
12
Fully tighten the wing bolt that was lightly tightened in Step 6.
13
Attach the projector door, lock it with the master key, and fasten it in place with 2 truss screws.
6
Undo the cord clamp.
Connect the connector.
POWER SUPPLY CABLE CONNECTOR, D-SUB 15P
Affix the cord clamp.
Summary of Contents for TETRIS GIANT
Page 9: ......
Page 13: ...4 HANDLING PRECAUTIONS 1 440 WS0293 EG DKC 1007 01 DKC 1007 01 DKC 0006 01...
Page 208: ...199 WIRE COLOR CODE TABLE MEMO 22...
Page 210: ...201 WIRING DIAGRAM 23 23 WIRING DIAGRAM D 1 3...
Page 211: ...202 WIRING DIAGRAM 23 D 2 3...
Page 212: ...203 WIRING DIAGRAM 23 D 3 3...
Page 214: ......