Parts replacement, maintenance inspections and troubleshooting should be carried out by site maintenance personnel
only be carried out by professionals with the appropriate specialised knowledge.
Site maintenance personnel:
Individuals with experience in maintaining amusement equipment, vending machines, etc., working under the super-
vision of the owner/operator of this product to maintain machines within amusement facilities or similar premises by
carrying out everyday procedures such as assembly, maintenance inspections, and replacement of units/expendable
parts.
Activities to be carried out by site maintenance personnel:
Amusement equipment/vending machine assembly, maintenance inspection and replacement of units/expendable
parts.
Persons employed by amusement equipment manufacturers, or involved in design, production, testing or mainte-
nance of amusement equipment. The individual should have either graduated from technical school or hold similar
Amusement equipment/vending machine assembly, repair/adjustment of electrical/electronic/mechanical parts.
Procedures not described in this manual or marked as ‘to be carried out by site
out by personnel without the necessary skill or technology. Work carried out by
Summary of Contents for Giant Plants vs Zombies The Last Stand
Page 2: ......
Page 8: ...vi...
Page 10: ...1...
Page 63: ...54...
Page 68: ...59 PARTS LIST 13 PARTS LIST cont Gun Mech parts FIGURE 2...
Page 70: ...61 PARTS LIST 13 FIGURE 3...
Page 72: ...63 PARTS LIST 13 PARTS LIST cont Computers and Boards 1 4 2 5 3 FIGURE 4 6 7...
Page 75: ...66 WIRING DIAGRAMS 14 WIRING DIAGRAMS 14 14 SCHEMATIC DIAGRAM...
Page 76: ......
Page 77: ......