BREEZAIR EXQ/EXS/EXVQ EVAPORATIVE COOLER OWNER’S MANUAL
|
9
MAINTENANCE SCHEDULE
Service No.
Service Date Service Technician
Service Company
No.1
........................... ......................................
............................................
No.2
........................... ....................................... ............................................
No.3
............................ .......................................
............................................
No.4
............................ .......................................
............................................
No.5
............................ .......................................
............................................
Service Item
Check/Adjust
Clean
Replace
1 2 3 4 5 1 2 3 4 5 1 2 3 4 5
Water Distribution System
Chillcel Pads (replace as required)
Pad Retaining Washers/Pins
Tank/Water Reservoir
Pump Filter
Water Probes
System Washers, Seals and O’Rings
(replace as required)
Drain Valve/Bleed Funnel operation
Component Function
Pump operation
Drain Valve operation
Motor Operation
Solenoid operation
Wall Control operation
General Operation
Water Level Set Point
Water Fill Time
Water Drain Time
Water Distribution across Pads
Airflow through system/Outlets
General Product condition (includes
correct fitting of all components and
items - replace as required)
We require that the following components and the operation thereof, be checked/serviced after the
first year, then every 2 years for residential purposes, or every year for commercial purposes, as
Maintenance Schedule servicing.
Summary of Contents for Breezair EXQ
Page 15: ......